My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7C, Motion to Authorize Staff to Contract with Bolton & Menk
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
09-8-08-R
>
7C, Motion to Authorize Staff to Contract with Bolton & Menk
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 10:05:24 AM
Creation date
9/10/2008 10:02:57 AM
Metadata
Fields
Template:
General
Document
Motion to Contract Bolton & Menk
General - Type
Motion to Contract Bolton & Menk
Date
9/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ Evaluate potential for specialty trail design to avoid lake impacts. <br />~ Evaluate feasibility of trail construction adjacent to Highway lOin regards to clear zone requirements, <br />ditch requirements and state highway right-of-way. <br />~ Evaluate potential for utilizing a paved shoulder design as a dedicated bike lane for "high impact" <br />segments along the trail corridor. <br />~ Identify the feasibility of a dedicated bike lane or separate trail crossing at Bridge No. 4627 north of <br />TH 5 1. <br />~ Identify Rice Creek Watershed District, DNR and Corps of Engineers permitting requirements. <br />~ Conduct preliminary design review meeting with Rice Creek Watershed District <br />~ Identify MnDOT permitting requirements. <br />~ Identify County permitting requirements. <br />~ Other environmental and miscellaneous issues identified by the project team and stakeholders4 <br /> <br />Bolton & Menk will review the draft layout and cost estimates prepared by the City in 20044 We will discuss <br />the potential of this alternative in our feasibility report. Bolton & Menk understands that there are multiple <br />stakeholders and interests influencing the trail alignment, and we are committed to objectively evaluating the <br />options and recognizing the need to balance pedestrian needs, engineering and construction requirements and <br />costs. <br /> <br />At the request of City staff, our Senior Project Manager and Project Engineer will be available to present the <br />findings of the preliminary engineering report at a City Council meeting; Parks, Trails and Recreation <br />Committee meeting; and a public information meeting. <br /> <br />PROJECT SCHEDULE <br /> <br />The following project schedule is proposed: <br /> <br />Council Award Project. 04 .......... ....440........... ............... ........ ..4H............ ............ .......... ...... September 8, 2008 <br />Kick-off Meeting w/City Staff...........H............................................................ Week of September 8, 2008 <br />Design review meeting with RCWD................................................H.................. Week of October 6,2008 <br />Submit Draft Feasibility Report for City Review...................................................H.....HHOctober 10, 2008 <br />Meeting with Parks, Traits and Recreation Committee* ........................... Between Oct. 10 - Nov. 3, 2008 <br />Public Information Meeting* ......4...............................04.04......................... Between Oct. 10 - Nov. 3, 2008 <br />Sub m it Fin a I F eas i b i I i ty R e po rt ........ 4 . . . . . . . . . . . . . . .4 . . . . 4 . . . . . . . . . . . . . . . . . . . . 4 . . . . . . . . . . . . . . . .4 . . . . . . . . . . . . . . . 4 . . No v e m be r 3, 2008 <br />Present Feasibility Report at City Council Meeting* ...............................4.......................... November 2008 <br /> <br />*80lton & Menk is prepared to adjust the proposed meeting schedule <br />as necessary to meet the City of Arden Hills' needs. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.