Laserfiche WebLink
<br />PROJECT DESIGN TEAM <br /> <br />It is the policy of Bolton & Menk, Inc. to staff all major projects by utilizing a tealTI approach, with close <br />coordination between the client and the tealTI maintained at all times. This proposed team will report directly to <br />designated City of Arden Hills Staff. We strive to provide the best team services possible, with the tealTI <br />specifically tailored to meet the needs of the client. Following are brief profiles of each of the team Inembers. <br />A resume for Travis Winter, P.E. and Lee Stallings, Senior Technician, which were not included in our general <br />consulting services SOQ, are also attached. <br /> <br />PRINCIPAL-IN-CHARGE <br />Bruce Firkins, P.E., Bolton & Menk's Vice President, will serve as the Principal-In-Charge for this project. <br />Mr. Firkin's responsibilities to this project include contract administration as well as overall quality assurance <br />and quality control. Throughout this project, he will be available to the City of Arden Hills, in addition to the <br />Senior Project Manager, to discuss the project team's overall performance. <br /> <br />SENIOR PROJECT MANAGER <br />Marcus Thomas, P.E., will serve as the Senior Project Manager and primary contact to the City of Arden <br />Hills. Mr. Thomas will have detailed involvement with all aspects of the project. He will provide overall <br />technical supervision, adlninistration, and coordination of the project. He win make recommendations, revie\v <br />the quality of the work, and monitor the progress of the project. He will give daily direction to the project team <br />to ensure that all project goals are met. He will attend all project and public lneetings as required by the City <br />and lead any public presentations as required. <br /> <br />PROJECT ENGINEER <br />Travis Winter, P.E., will cOlnplete the preliminary and final infrastructure design as well as the preliminary <br />engineering report under the direction of the Senior Project Manager. Mr. Winter will also be directly available <br />to the City as required and will assist Mr. Thomas with public presentations and meetings. <br /> <br />WATER RESOURCES ENGINEER <br />Lani Leichty, P.E., will assist the tealTI in conlpleting the preliminary stonn water lnanagement plan as well as <br />identifying potential wetland impacts, preparing mitigation plan, and designing storm water quality <br />improvement plans. <br /> <br />ENGINEERING TECHNICIAN <br />Lee Stallings, a Senior Technician with Bolton & Menk, Inc., will serve as the Engineering Technician for the <br />project. Under the direction of the Senior Project Manager, Mr. Stallings will work closely with the Project <br />Engineer in generating exhibits and presentation materials required throughout the project and will cOlnplete <br />the detailed drafting required for final design. <br /> <br />