My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7B, 2009 PMP & Resolution 2008-030
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
09-8-08-R
>
7B, 2009 PMP & Resolution 2008-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 10:07:48 AM
Creation date
9/10/2008 10:06:37 AM
Metadata
Fields
Template:
General
Document
2009 PMP & Resolution 2008-030
General - Type
2009 PMP & Resolution 2008-030
Date
9/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TRAVIS WINTER, P .E. <br />Project Engineer <br /> <br />EDUCA TION <br />Bachelor of Science Degree <br />Civil Engineering <br />North Dakota State <br />University <br />Fargo, ND <br /> <br />SUMMARY <br />Mr. Winter is a Project Engineer for the Bumsville Office of Bolton <br />& Menk, Inc. For the past 5 years, Mr. Winter has worked as a <br />design engineer and construction observer with lllunicipal <br />engineering design and construction phase experience. <br /> <br />REGISTRA TION <br />Registered Professional <br />Engineer, Minnesota <br /> <br />Mr. Winter's experience includes a variety of engineering tasks <br />including preparation of Preliminary Engineering Reports, <br />preparation of Plans and Specifications and preparation of cost <br />estimates. On-site construction duties typically include observing <br />the contractor to assure that the improvelllents are being constructed <br />in general conformance with the plans and specifications. Other <br />responsibilities include maintaining a daily diary, measurement of <br />completed quantities, preparing pay estimates, tracking project <br />schedules, coordination of construction staking and Inaterials <br />testing, and maintaining day-to-day communication with the client, <br />contractor and property owners affected by the project. <br /> <br />ORGANIZA TIONS <br />American Society of Civil <br />Engineers <br /> <br />National Society of <br />Professional Engineers <br /> <br />Minnesota Society of <br />Professional Engineers <br /> <br />His experience includes working on various ne\v construction <br />projects as well as reconstructs for the cities of Eagan, Northfield, <br />Hampton, Empire, Marshall, Springfield, and Bird Island. <br /> <br />MN/DoT <br /> <br />CERTIFICATIONS <br />Aggregate Production I <br />Bituminous Street I & II <br />Concrete Field I <br />Grading and Base I & II <br />Erosion/Sediment Control <br />· Design of SWPPP <br /> <br />EXPERIENCE <br /> <br />The following are projects for which Mr. Winter has performed <br />design engineer services: <br /> <br />2008 Water Street Parking 15th Street Enhancements and <br />Reconstruction, Northfield, MN <br />Construction cost for this project was over $1 .7 million, it involved <br />reconstructing three blocks of the downtown area in N011hfield. <br />Along with full utility and street replacement, surface improvelllents <br />included streetscape enhancements, pedestrian prolnenade <br />construction, Cannon River edge improvelllents, pervious pavers, <br />and pervious asphalt pavement. <br /> <br /> <br />2007 MSA Project, Northfield, Minnesota <br />This project involved reclaiming and overlaying over a Inile of <br />streets that are in the city's Municipal State Aid net\;york~ The <br />project also involved replacement of 1,500 feet of trunk watennain <br />along portions of the project streets. <br /> <br />2006 5th Street Improvements, Northfield, Minnesota <br />Mr. Winter was a Design Engineer on this five block street and <br />utility reconstruction project. The project involved <br />of street surface, curb and <br />
The URL can be used to link to this page
Your browser does not support the video tag.