My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7B, 2009 PMP & Resolution 2008-030
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
09-8-08-R
>
7B, 2009 PMP & Resolution 2008-030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2008 10:07:48 AM
Creation date
9/10/2008 10:06:37 AM
Metadata
Fields
Template:
General
Document
2009 PMP & Resolution 2008-030
General - Type
2009 PMP & Resolution 2008-030
Date
9/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TRAVIS WINTER, P.E. <br />Project Engineer <br /> <br />2006 Street & Utility Improvements, Mountain Lake, Minnesota <br />This $2million reconstruction project consisted of the design of improvements to sanitary sewer~ storm <br />sewer, watermain, raw watermain, curb and gutter, and bitulninous street pavement. Mr. Winter was the <br />Design Engineer on this project. <br /> <br />2006 Street & Utility Improvements, Springfield, Minnesota <br />Mr. Winter was the Design Engineer on this $2mil1ion reconstruction project, which consisted of the <br />improvements to sanitary sewer~ storm sewer, watermain, raw watermain, curb and gutter, and bituminous <br />street pavement. <br /> <br />North Highland Avenue Improvements, New Ulm, Minnesota <br />This was a $5 million federally funded project for a new four-lane divided collector street. It included the <br />design of 10,000 feet of curb and gutter, sanitary sewer, watelmain, storm sewer, stolm treatment ponds <br />and bituminous pavement. <br /> <br />2005 Street & Utility Improvements, Bird Island, Minnesota <br />This $11 InilIion Rural Development reconstruction project consisted of reconstructing approxilnately <br />eighty (80) blocks of city streets~ It included the design of 49,000 feet of curb and gutter, sanitary sewer, <br />stonn sewer, watennain replacelnent and bituminous street reconstruction. Mr. Winter served as a Design <br />Engineer for this project. <br /> <br />2004 T.H. 2]2 Frontage Road, Olivia, Minnesota <br />This 0.5-mile project was a new street design. It included the design of curb and gutter, storm sewer and <br />bitulninous pavement. <br /> <br />2004 Street & Utility Improvements, Waverly, Minnesota <br />This reconstruction project consisted of reconstructing 5 blocks of existing city streets. Included in the <br />project design for Mr. Winter were curb and gutter, sanitary sewer, watermain, storm sewer and <br />bituminous street reconstruction. <br /> <br />2004 County State Aid Highway, No.9 (Atlantic Avenue) Reconstruction, S.A.P. No. 86-609-13, <br />Waverly, Minnesota <br />This State Aid reconstruction project consisted of reconstructing 6 blocks ofC.S.A.H No.9. It included <br />design of curb and gutter, stonn sewer replacement and bituminous street reconstruction. <br /> <br />2004 Sleepy Hollow Improvements, Sleepy Eye, Minnesota <br />Mr. Winter served as Design Engineer and Construction Observer for this residential subdivision project. <br /> <br />The following are projects for which Mr. Winter performed construction observation services: <br /> <br /> <br />2008 Street and Utility Improvements, Eagan, MN <br />Over four miles of major arterial and local collector streets were edge milled and overlayed on this $2 <br />million dollar project. Six blocks of watermain and sanitary sewer were also reconstructed as a part of this <br />project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.