Laserfiche WebLink
<br />TRAVIS WINTER, P.E. <br />Project Engineer <br /> <br />2006 Street & Utility Improvements, Mountain Lake, Minnesota <br />This $2million reconstruction project consisted of the design of improvements to sanitary sewer~ storm <br />sewer, watermain, raw watermain, curb and gutter, and bitulninous street pavement. Mr. Winter was the <br />Design Engineer on this project. <br /> <br />2006 Street & Utility Improvements, Springfield, Minnesota <br />Mr. Winter was the Design Engineer on this $2mil1ion reconstruction project, which consisted of the <br />improvements to sanitary sewer~ storm sewer, watermain, raw watermain, curb and gutter, and bituminous <br />street pavement. <br /> <br />North Highland Avenue Improvements, New Ulm, Minnesota <br />This was a $5 million federally funded project for a new four-lane divided collector street. It included the <br />design of 10,000 feet of curb and gutter, sanitary sewer, watelmain, storm sewer, stolm treatment ponds <br />and bituminous pavement. <br /> <br />2005 Street & Utility Improvements, Bird Island, Minnesota <br />This $11 InilIion Rural Development reconstruction project consisted of reconstructing approxilnately <br />eighty (80) blocks of city streets~ It included the design of 49,000 feet of curb and gutter, sanitary sewer, <br />stonn sewer, watennain replacelnent and bituminous street reconstruction. Mr. Winter served as a Design <br />Engineer for this project. <br /> <br />2004 T.H. 2]2 Frontage Road, Olivia, Minnesota <br />This 0.5-mile project was a new street design. It included the design of curb and gutter, storm sewer and <br />bitulninous pavement. <br /> <br />2004 Street & Utility Improvements, Waverly, Minnesota <br />This reconstruction project consisted of reconstructing 5 blocks of existing city streets. Included in the <br />project design for Mr. Winter were curb and gutter, sanitary sewer, watermain, storm sewer and <br />bituminous street reconstruction. <br /> <br />2004 County State Aid Highway, No.9 (Atlantic Avenue) Reconstruction, S.A.P. No. 86-609-13, <br />Waverly, Minnesota <br />This State Aid reconstruction project consisted of reconstructing 6 blocks ofC.S.A.H No.9. It included <br />design of curb and gutter, stonn sewer replacement and bituminous street reconstruction. <br /> <br />2004 Sleepy Hollow Improvements, Sleepy Eye, Minnesota <br />Mr. Winter served as Design Engineer and Construction Observer for this residential subdivision project. <br /> <br />The following are projects for which Mr. Winter performed construction observation services: <br /> <br /> <br />2008 Street and Utility Improvements, Eagan, MN <br />Over four miles of major arterial and local collector streets were edge milled and overlayed on this $2 <br />million dollar project. Six blocks of watermain and sanitary sewer were also reconstructed as a part of this <br />project. <br />