Laserfiche WebLink
,--0 t <br />,,--ARZEN HILLS <br />MEMORANDUM <br />DATE: October 1, 2008 PC Agenda Item 3.B <br />TO: Planning Commission <br />FROM: Meagan Beekman, Planner I <br />SUBJECT: Planning Case #: 08-025 <br />PUD Amendment and Site Plan Review <br />Boston Scientific <br />4100 Hamline Avenue <br />ATTACHMENTS: A — Application and Supporting Materials <br />B — Air Photos and photographs <br />C — Plans and Surveys <br />Requested Action <br />The applicants have requested a Planned Unit Development (PUD) Amendment and Site Plan <br />Review to construct a nitrogen storage tank and a liquid nitrogen vaporizer on the east side of <br />Building 14 located on the north end of the Boston Scientific campus. <br />BackLyround <br />1. Overview of Request: <br />The applicants have requested a PUD (9'1h) Amendment and Site Plan Review to construct a <br />nitrogen storage tank that would be ten feet in diameter and 28 feet in height. The tank <br />would be located on a concrete pad, adjacent to an existing outdoor nitrogen storage tank, on <br />the east side of Building 14, which is located on the north side of the campus (Attachment <br />Q. In addition to the storage tank, and on an existing concrete pad, the applicant would <br />install a liquid nitrogen vaporizer. The vaporizer would be five feet, nine inches square, and <br />fifteen feet, nine inches in height. The tanks are necessary in order to meet the demand of <br />Boston Scientific's manufacturing process. All of the new equipment would be surrounded <br />City of Arden Hills <br />Planning Commission Meeting for October 1, 2008 <br />IlMetro-inet.uslardenhillslPlanninglPlanning Cases 12008 1 08-025 Boston Scientific PUD Amendment and Site Plan Review (Pending) 1100108 - <br />PC Report - Boston Scientific PUD Amendment and Site Plan Rev a d Of 6 <br />