Laserfiche WebLink
by fencing similar to what is currently surrounding the existing equipment in that area. Since <br />the installation of the nitrogen tank and vaporizer were not included on the original approved <br />Master Plan, a Master Plan PUD amendment and site plan review are needed for the proposal <br />to go forward. <br />Currently there are several storage tanks, a vaporizer, and generator to the east of Building B <br />which house the liquid nitrogen that Boston Scientific uses for research and development of <br />their products, including a 50 foot tall storage tank that was approved in October of 2004 by <br />the City. Additionally, there is currently a 500 gallon tank and related equipment located <br />east of Building 14 in the same location as the proposed tank. <br />The applicant has submitted a letter addressing describing the project, a site plan, pictures of <br />similar generator units and storage tanks on site, and pictures of the location for the proposed <br />tank and vaporizer (Attachment Q. <br />The following table lists the previous planning cases relating to the Boston Scientific <br />Campus. Please note that Building 14 was previously referred to as Building N. <br />Planning <br />Request <br />Comments <br />CC Action <br />Case <br />06-033 <br />Master Plan PUD 8th2, <br />250 square foot addition to <br />11/27/06 (A) <br />amendment <br />Building N <br />06-024 <br />Master Plan PUD 71F-10,225 <br />square foot addition to <br />08/28/06 (A) <br />Amendment <br />Building N <br />Expired <br />Master Plan PUD 6t <br />06-010 <br />Amendment <br />perking Modifications <br />04/24/06 (A) <br />Master Plan PUD 5th <br />Installation of nitrogen <br />04-18 <br />amendment <br />generator, vaporizers, and 50- <br />10/25/04 (A) <br />foot tall storage tank <br />Master Plan PUD 4t <br />04-17 <br />amendment <br />Parking Modifications <br />07/12/04 (A) <br />04-13 <br />Special Use Permit <br />Satellite antennae for Building L <br />07/12/04 (A) <br />04-04 <br />Site Plan Review <br />Temporary Walkway <br />02/23/04 (A) <br />Master Plan PUD 3r <br />Moving Addition J from Phase 2 <br />04-01 <br />Amendment and Final <br />to Phase 1 and slightly larger <br />02/23/04 (A) <br />PUD <br />Addition J <br />03-25 <br />Master Plan PUD 2° <br />Site layout change to allow for <br />09/29/03 (A) <br />amendment <br />Building N Addition <br />03-24 <br />Site Plan Review <br />Building N Addition <br />09/29/03 (A) <br />03-23 <br />Site Plan Review <br />Parking Ramp #1 <br />09/29/03 (A) <br />03-07 <br />Site Plan Review <br />Building Addition I <br />03/31/03 (A) <br />City of Arden hills <br />Planning Commission Meeting for October 1, 2008 <br />IlMetro-inet.uslardenhillslPlanninglPlanning CasesI2008108-025 Boston Scientific PUD Amendment and Site Plan Review (Pending) 1100108 - <br />PC Report - Boston Scientific PUD Amendment and Site Plan ReVawkde � of 6 <br />