My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4D, Site Plan for Boston Sci to install Nitrogen Tank
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
10-27-08-R
>
4D, Site Plan for Boston Sci to install Nitrogen Tank
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 10:00:48 AM
Creation date
12/2/2008 9:59:11 AM
Metadata
Fields
Template:
General
Document
Boston Scientific Nitrogen Tank
General - Type
Boston Scientific Nitrogen Tank
Date
10/20/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br />~HILLS <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />October 27, 2008 <br /> <br />TO: <br /> <br />Mayor & City Council <br /> <br />FROM: <br /> <br />Meagan Beekman, City Planner <br /> <br />p <br /> <br />SUBJECT: Planning Case #: 08-025 <br />PUD Amendment and Site Plan Review <br />Boston Scientific <br />4100 Hamline Avenue <br /> <br />Reauest <br /> <br />Approve Planning Case 08-025 for a PUD Amendment and Site Plan Review for Boston <br />Scientific at 4100 Hamline Avenue Based on the Findings of Fact and the Submitted Plans as <br />Amended by the Four Conditions in the October 27, 2008, Memo to the City Council. <br /> <br />Backl!round <br /> <br />The applicants have requested a PUD (9th) Amendment and Site Plan Review to construct a <br />nitrogen storage tank that would be ten feet in diameter and 28 feet in height. The tank would be <br />located on a concrete pad, adjacent to an existing outdoor nitrogen storage tank, on the east side <br />of Building 14, which is located on the north side of the campus (Attachment C). In addition to <br />the. storage tank, and on an existing concrete pad, the applicant would install a liquid nitrogen <br />vaporizer. The vaporizer would be five feet, nine inches square, and fifteen feet, nine inches in <br />height. The tanks are necessary in order to meet the demand of Boston Scientific's <br />manufacturi~g process. All of the new equipment would be surrounded by fencing similar to <br />what is currently surrounding the existing equipment in that area. Since the installation of the <br />nitrogen tank and vaporizer were not included on the original approved Master Plan, a Master <br />Plan PUD amendment and site plan review are needed for the proposal to go forward. <br /> <br />Currently there are several storage tanks, a vaporizer, and generator to the east of Building B <br />which house the liquid nitrogen that Boston Scientific uses for research and development of their <br /> <br />City of Arden Hills <br />City Council Meetingfor October 27,2008 <br /> <br />\\Metro-inet.us\ardenhills\Planning\Planning Cases\2008\08-025 Boston Scientific PUD Amendment and Site Plan Review (PC <br />Approved) \102708 - CC Report - Boston Scientific PUD Amend and Site Plan Review.doc <br />Page 1 of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.