My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4D, Site Plan for Boston Sci to install Nitrogen Tank
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
10-27-08-R
>
4D, Site Plan for Boston Sci to install Nitrogen Tank
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 10:00:48 AM
Creation date
12/2/2008 9:59:11 AM
Metadata
Fields
Template:
General
Document
Boston Scientific Nitrogen Tank
General - Type
Boston Scientific Nitrogen Tank
Date
10/20/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />products, including a 50 foot tall storage tank that was approved in October of 2004 by the City. <br />Additionally, there is currently a 500 gallon tank and related equipment located east of Building <br />14 in the same location as the proposed tank. <br /> <br />The applicant has submitted a letter addressing describing the project, a site plan, pictures of <br />similar generator units and storage tanks on site, and pictures of the location for the proposed <br />tank and vaporizer (Attachment C). <br /> <br />Findin!!s of Fact <br /> <br />The Planning Commission offers the following eight findings of fact for review: <br /> <br />General Findings: <br />1. The proposed plans meet all of the requirements of the 1-1 Zoning District <br />2. The proposed storage tank and vaporizer are permitted accessory uses and are also <br />permitted by the Boston Scientific PUD Master Plan <br />3. The proposed storage tank and vaporizer are compatible with the character of the nature <br />of the industrial area and will not adversely impact the surrounding properties <br />4. The proposed storage tank and vaporizer would be effectively screened by the existing <br />landscaping and trees located to the west and north of the site <br />5. The proposed storage tank and vaporizer would be visible from the Boston Scientific <br />property to the south and east <br />6. The proposed plans are not anticipated to negatively impact traffic, parking, access, or <br />circulation on the property <br />7. The proposed plans are not anticipated to have a negative impact on noise <br />8. The proposed plans would not impact drainage or grading on the site <br /> <br />Recommendation <br /> <br />The Planning Commission reviewed Planning Case 08-025 and unanimously recommends <br />approval (7-0) of the PUD Amendment and Site Plan Review based on the findings of fact and <br />the submitted plans as amended by the following four conditions: <br />1. The applicant shall continue to abide by the conditions of approval as stated in the <br />approved Master Plan PUD except as amended by the eight subsequent amendments. <br />2. The project shall be completed in accordance with the plans submitted as amended by <br />the conditions of approval. Any significant changes to these plans, as determined by <br />the City Planner, shall require review and approval by the Planning Commission and <br />City Council. <br />3. All equipment and tanks shall be enclosed in a fence of similar height and materials <br />to the existing fencing in that area. <br /> <br />City of Arden Hills <br />City Council Meetingfor October 27,2008 <br /> <br />\ \Metro-inet.us\ardenhills\Planning\Planning Cases\2008\08-025 Boston Scientific PUD Amendment and Site Plan Review (PC <br />Approved) \102708 - CC Report - Boston Scientific PUD Amend and Site Plan Review.doc <br />Page 2 of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.