My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7H, CP Rail Bridge & Old Hwy 10 Trail
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2008
>
12-08-08-R
>
7H, CP Rail Bridge & Old Hwy 10 Trail
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2008 12:10:15 PM
Creation date
12/9/2008 12:07:17 PM
Metadata
Fields
Template:
General
Document
7H, CP Rail Bridge & Old Hwy 10 Trail
General - Type
7H, CP Rail Bridge & Old Hwy 10 Trail
Date
12/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br /> <br />MEMORANDUM <br /> <br />DATE: <br /> <br />December 4, 2008 <br /> <br />TO: <br /> <br />Mayor and City Council <br />Ron Moorse, City Administrator <br /> <br />FROM: <br /> <br />Kristine Giga, Civil Engineer <br />Michelle Olson, Parks and Recreation Manager <br />Greg Hoag, Public Works Director <br /> <br />SUBJECT: <br /> <br />Future Snelling/Old Highway 10 Trail with Improvements to CP Rail <br />Bridge for Pedestrian Crossing <br /> <br />BACKGROUND <br /> <br />At the September 8, 2008, meeting, the City Council authorized staff to contract with Bolton & <br />Menk, Inc. to complete a feasibility report for the future Snelling/Old Highway 10 trail with <br />improvements to the CP Rail Bridge for a pedestrian crossing. <br /> <br />Bolton & Menk, Inc. staff presented preliminary results of the feasibility report at the <br />November 25,2008, Parks, Trails and Recreation Committee (PTRC.) Topics of discussion <br />included proposed typical cross-sections and potential trail locations, as well as associated <br />impacts and costs. Improvements to the CP Rail Bridge were also discussed. <br /> <br />A copy of the completed feasibility report is attached. Representatives from Bolton & Menk <br />will attend the City Council meeting to present the results. The next step in the process is for <br />the City Council to receive the feasibility report and to provide direction on how to proceed <br />with this project. <br /> <br />Improvements to the CP Rail Bridge are currently included in the Capital Improvement Plan <br />for 2010. In order for improvements to be completed in the 2010 construction season, the <br />planning and design should occur in 2009. It is anticipated that it will take approximately a <br />year to work through the approval process with the railroad. Staff recommends utilizing <br />Bolton & Menk, Inc. for this work, as they have familiarized themselves with the project area <br /> <br />\ \M etro- inet. us\ardenhills\P R&PW\Engineering \2008\Counci 1_ Actions\ 12 -8-08M emo _ CPRai 1_ T rail_ Feasibility Report.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.