My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6A, Hold Public Hearing for 2009 PMP
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
01-12-09-R
>
6A, Hold Public Hearing for 2009 PMP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 12:08:39 PM
Creation date
1/12/2009 12:05:32 PM
Metadata
Fields
Template:
General
Document
Hold Public Hearing for 2009 PMP
General - Type
Hold Public Hearing for 2009 PMP
Date
1/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2009 PMP <br />1/8/2009 <br />Page 3 <br /> <br />infiltration. Chimney seals and solid manhole covers will also be placed on all sanitary sewer <br />manholes. <br /> <br />Storm Sewer <br />The existing storm sewer system will be improved and expanded throughout the neighborhood. <br />Best management practices, such as rain gardens, infiltration swales, and other features will also <br />be incorporated into the project in order to meet the Rice Creek Watershed District's water <br />quality requirements. <br /> <br />FINANCIAL IMPLICATIONS <br />The estimated total project cost for the improvements is $1,948,815.33, including engineering <br />fees. Consistent with the Assessment policy, an additional 37% overhead for the street <br />improvements has been included, which was used to calculate preliminary assessment rates. The <br />overhead is broken down as follows: <br /> <br />City Administration <br />Design Engineering <br />Construction Engineering <br />Legal <br />Fiscal <br />Interest During Construction <br />Assessment Roll Preparation <br />Contingencies <br />TOTAL <br /> <br />2.5% <br />10.0% <br />10.0% <br />2.0% <br />3.0% <br />4.5% <br />1.0% <br />4.0% <br />37.0% <br /> <br />The City's portion of the project costs are currently budgeted from the PIR and Utility Enterprise <br />Funds (sanitary sewer, surface water and watermain funds). A project cost summary is listed <br />below. <br /> <br />Pro.ieet Cost Summary <br />Roadway Improvements* $ 1,564,639.33 <br />Watennain Improvements** $ 20,228.00 <br />Sanitary Sewer Improvements** $ 42,146.00 <br />Storm Sewer Improvements** $ 321,802.00 <br />Total Pro.ieet Costs $ 1,948,815.33 <br /> <br />* includes 370/0 overhead <br />** includes 300/0 engineering & contingency <br /> <br />Amount received from assessments $ 782,319.66 <br />Amount funded by the City (including assessment of City parcel) $ 1,166,495.67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.