Laserfiche WebLink
<br /> <br />E3<:::)L T<:::)N & IV1 EN K, I NC@ <br />Consulting Engineers & Surveyors <br />12224 Nicollet Avenue · Burnsville, MN 55337 <br />phone (952) 890-0509 -Fax (952) 890-8065 <br />www.bolton-menk.com <br /> <br />MEMORANDUM <br /> <br />Date: February 3, 2009 <br /> <br />To: Kristine Giga, P.E., Civil Engineer <br /> <br />Cc: Marcus Thomas, P.E., Project Manager <br /> <br />From: Travis Winter, P.E., Project Engineerji--J <br /> <br />Subject: Trail / C.P. Rail Bridge <br />City of Arden Hills <br />BMl Project No.: T16.100325 <br /> <br />The following is a summary of the correspondence with Canadian Pacific Railroad that occurred <br />regarding construction of a pedestrian facility under the bridge that crosses Old Hwy lOin Arden Hills: <br /> <br />· October 6, 2008 - Phone Conversation: Charlie Duffy (CP Rail Stnlctural Engineer), Travis <br />Winter. I called Mr. Duffy to discuss the City's potential interest in constructing a pedestrian <br />crossing under the above referenced bridge. He was aware that the City had been looking at this <br />from previous conversations with City Staff and consultants. We discussed how this bridge was <br />similar to the one in New Brighton over Old Hwy 8 where a pedestrian crossing was constructed <br />previously. Replacement of the Arden Hills bridge is not a part ofC.P.'s 10 year capital <br />improvement plan. C.P. is willing to allow a crossing to be constructed as long as it does not <br />interfere with the structural integrity of the bridge. <br /> <br />· Decelnber 30, 2008 - Phone Conversation: Charlie Duffy (CP Rail Structural Engineer), Travis <br />Winter. I called Mr. Duffy to discuss potential cost sharing of a bridge replacement with the City. <br />Mr. DuffY stated that any cost sharing with the City would not be enough to move up the <br />replacement schedule of the bridge, there are too many other projects with higher priority. C.P.. <br />will work with the City to make a crossing happen. To move forward in the process, send design <br />plans to C.P. for review. Send plans to Mr. Duffy and he will distribute to the appropriate <br />personnel for review. Construction of the crossing in 2010 is a reasonable goal. <br /> <br />- January 30, 2009 - Phone Conversation: Charlie DuffY (CP Rail Structural Engineer), Travis <br />Winter. The wooden bridge over New Brighton Road in Arden Hills is not on C.P.' s 10 year <br />._capital impr_ovement plan. There are. no_bridges on that rail line . scheduled for replacement in the__ <br />next ]0 years. The New Brighton Road bridge was 'driven' (piles were driven) in the 80's, and <br />the deck was replaced 7 or 8 years ago. The bridge is in good shape. The railroad has no <br />preference as to which side the crossing is constructed, whichever side makes the most sense for <br />the City will be fine. <br /> <br />F :\_ Civil\ARDH\ Tl61 00325\Corres\memo _020309 .doc <br /> <br />DESIGNING FOR A BETTER TOMORROW <br />Bolton & Menk is an equal opportunity employer. <br />