Laserfiche WebLink
<br />Safe Routes to School Project Review - 03/16/09 <br /> <br />. <br /> <br />The neighborhood connection will not be improved in 2009 and therefore, the project will <br />be difficult to evaluate. <br />It would be more cost effective to do the entire project at one time. <br /> <br />. <br /> <br />4. Postpone the project indefinitely. <br /> <br />Pros <br />· The City will save on\the expense of this trail project. <br /> <br />Cons <br />· Extensive engineering expenses and staff time have been incurred for this project. <br />· $175,000 grant will be forfeited. <br />· Construction of a trail in this corridor will be difficult to do in the future without <br />assistance. The PTRC has identified this as an important regional trail link. <br /> <br />7 <br />