My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7A, County Road E Pedestrian Improvements
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
05-26-09-R
>
7A, County Road E Pedestrian Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 8:45:45 AM
Creation date
5/22/2009 9:33:28 AM
Metadata
Fields
Template:
General
Document
County Road E Pedestrian Improvements
General - Type
County Road E Pedestrian Improvements
Date
5/26/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />=~ <br /> <br />Kimley-Horn <br />and Associates, Inc. <br /> <br /> <br />Ms. Kristine Giga, P.E., May 19,2009, P. 3 <br /> <br />Taskl,3: FinalDesign Bridgl'Plans & Tl'chnieal Special Provisions <br />Based upon eomments from the City, Ramsey County, and Mn/DOT, we will prepare <br />final design plans and teehniealspedaI provisions for the bridge modifications. The <br />eonstructiondocumellts will meet typical Mn/DO'f and AASFlTO Bridge Design <br />Standards. The final bridge improvement plans will includefhefollowing spedfic <br />drawings: <br /> <br />. Title Sheet, including plan, elevation, cross"section,and quantities <br />. Traffic eontrol plans <br />. Bridge modification details, including deek and sidewalk modifications <br /> <br />We have assumed that one lane of traffic will be maintained on County Roade during <br />construction using flaggers or a tempOl'llry signal consistent with the 1994 bridgercpair <br />plans. <br /> <br />Wc have assumcd thatthe project plans will not be submitted to Stafe Aid. We will <br />prepare and submit the permit application to Mn/DOT for work in the right-of-way. We <br />will coordinate the workwith Rice Creek Watershed Distriet (RCWD) but have <br />assumed the District will not require any permits. We assume the City will prepare thc <br />projeetmanual, which will inelude the special provisions we prepare, and manage and <br />coordinate Bidding Phase. <br /> <br />Task 1.4: Public Meetings <br />We will present the final design at a City Council meeting; a Parks, Trails and <br />Reereation Committee meeting; and a public information mecting. These three <br />meetings as well as two (2) color graphics/exhibits on boards are included in the fee for <br />this task. <br /> <br />Task 1,5: Construction Services <br />We will provide the following construction administration services fortheprojcct: <br /> <br />. Provide part-time observation to document construction activities. We have <br />included 12 hours of inspection per week for the total constnletion duration of <br />three weeks. <br />. Respond to design questions from City staff or residents <br />. Prepare payment estimate (assnmed I) based on the construction observer's <br />field logs <br />. Trackfield notes, testing, and other items on the project <br />. Project filing and general administration <br />. Coordinate and attend weekly project meetings. We have assumed this will <br />include 3 meetings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.