Laserfiche WebLink
base, both painted black. Although the Zoning Code typically limits fences to a maximum <br />height of six feet, the needed security and fairly isolated location enables an exception to this <br />regulation. Canister stealth skin would be utilized along the highest 15 feet of the tower to <br />conceal the antennas inside (the number of antennas on this tower has not been specified). <br />Adjacent to the south would be a 16 by ten foot (160 square foot) equipment shed measuring <br />ten feet in height. The equipment shed would be constructed of tan -colored brick. Afour-foot <br />retention wall of unspecified design would partially encircle the lease tract as seen on the site <br />plan (Attachment Q. <br />For clarification, the lease agreement would be between Bethel University and AT&T <br />Mobility. The City of Arden Hills would not receive any payments as part of this agreement. <br />The applicant has submitted an application, project letter, site plan, elevations, and site <br />survey (Attachments A and C). <br />Bethel University operates under a CUP Master Plan. As the University comes forward with <br />plans, they are reviewed against the Master Plan for consistency. IWhile building plans <br />consistent with the Master Plan only require a site plan review, those not included in the <br />original plan must be approved through a CUP Amendment. The following planning cases <br />have been reviewed since the 1996 Master Plan was adopted: <br />...,.:....... v:, :. ... <br />Conditional Use <br />Extend Use of <br />09-006 <br />Permit Amendment <br />Temporary Classroom <br />5/11/2009 (A) <br />Building <br />Conditional Use <br />Add 112 New Parking <br />07-022 <br />Permit Amendment / <br />Spaces <br />9/24/2007 (A) <br />Site Plan Review <br />07-004 <br />Site Plan Review and <br />Variance <br />University Commons <br />3/26/2007 (A) <br />06-007 <br />Site Plan Review <br />Welcome Center <br />3/13/2006 (A) <br />04-010 <br />Conditional Use <br />Construct Temporary <br />4/24/2004A <br />( ) <br />Permit Amendment <br />Classroom Building <br />04-002 <br />Conditional Use Permit Amendment <br />New Dormitory <br />3/29/2004 (A) <br />02-010 <br />Site Plan Review <br />Amendment to Ona <br />6/18/2002 (A) <br />Orth Site Plan <br />00-001 <br />Conditional Use <br />Ona Orth Athletic <br />2/14/2000 (A) <br />Permit <br />Complex <br />99-010 <br />Site Plan Review <br />East Parking Entrance <br />8/9/1999 (A) <br />Conditional Use <br />Traffic Generation <br />98-007 <br />Permit Amendment / <br />Numbers <br />10/26/1998 (A) <br />Site Plan Review <br />97-014 <br />Site Plan Review <br />Building Addition <br />7/14/1997 (A) <br />96-026 <br />Conditional Use <br />Master Plan <br />1/2/1997 (A) <br />Permit Amendment <br />Amendment <br />City of Arden Hills <br />Planning Commission Meeting for June 3, 2009 <br />P: IPlanninglPlanning Cases 12009 1 09-009 Bethel CUP Amend with AT&T (pending)1060309 - PCReport -Bethel AT&T CUP Amendment. doc <br />Page 2 of 8 <br />