Laserfiche WebLink
02009 Westwood Professional Services, Inc. <br />Call 48 Hours before digging: <br />GOPHER STATE ONE CALL <br />Twin City Area 651-454-0002 <br />Mn. Toll Free 1-800-252-1166 <br />COUNTY <br />HYDRANT <br />-BIO-FILTRATION ROAD E <br />AREA #1 ..... <br />,... <br />DRAIN TILE <br />General Utility Notes <br />1. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS <br />ARE BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND LIMITED MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION SHALL <br />NOT BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION AND <br />NOTIFY THE OWNER OR ENGINEER OF DISCREPANCIES. <br />2. ALL SANITARY SEWER, STORM SEWER AND WATER MAIN INSTALLATIONS SHALL BE PER MINNESOTA PLUMBING CODE AND IN ACCORDANCE WITH <br />THE CURRENT EDITION OF "STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION AND SANITARY SEWER AND STORM <br />SEWER INSTALLATION AS PREPARED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA. <br />3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN THE NECESSARY FEDERAL, STATE AND LOCAL PERMITS FOR THE PROPOSED WORK <br />OR VERIFY WITH THE OWNER OR ENGINEER THAT PERMITS HAVE BEEN OBTAINED. PERMIT FEES SHALL BE THE RESPONSIBILITY OF THE <br />CONTRACTOR UNLESS OTHERWISE ARRANGED WITH THE OWNER. <br />4. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND DIMENSIONS OF DOORWAYS, RAMPS, TRUCK DOCKS, PRECISE <br />BUILDING DIMENSIONS AND EXACT BUILDING UTILITY CONNECTION LOCATIONS. <br />5. ALL PRIVATE UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SPECIFICATIONS OF THE APPROPRIATE UTILITY COMPANY. THE <br />CONTRACTOR SHALL COORDINATE THE SERVICE LINE CONSTRUCTION WITH THE UTILITY COMPANIES. <br />6. CONTRACTOR SHALL OBTAIN ALL NECESSARY CITY PERMITS FOR UTILITY CONNECTIONS, AND UTILITIES SHALL BE INSPECTED AND APPROVED <br />BY THE CITY. THE CITY SHALL BE NOTIFIED 48 -HOURS PRIOR TO COMMENCING WITH THE UTILITY CONSTRUCTION OR ANY REQUIRED TESTING. <br />CONTRACTOR SHALL NOT OPERATE, INTERFERE WITH, CONNECT ANY PIPE OR HOSE TO, OR TAP ANY WATER MAIN BELONGING TO THE CITY <br />UNLESS DULY AUTHORIZED TO DO SO BY THE CITY. ANY ADVERSE CONSEQUENCES OF SCHEDULED OR UNSCHEDULED DISRUPTIONS OF <br />SERVICE TO THE PUBLIC ARE TO BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />7. WATER MAIN LENGTHS AS SHOWN ARE APPROXIMATE HORIZONTAL LENGTHS. ALLOW FOR ADDITIONAL PIPE WHEN INSTALLING ON SLOPES OR <br />WHEN DEFLECTIONS ARE REQUIRED. THE JOINT DEFLECTIONS SHALL NOT EXCEED THE MAXIMUM RECOMMENDED BY THE PIPE MANUFACTURER <br />OR BY LOCAL GOVERNING SPECIFICATIONS. FITTINGS REQUIRED TO CONSTRUCT WATER MAIN SHALL BE INCLUDED IN WATER MAIN <br />CONSTRUCTION. <br />8. PROVIDE WATER MAIN THRUST RESTRAINTS PER CITY STANDARD REQUIREMENTS. <br />9. A MINIMUM VERTICAL SEPARATION OF 18 INCHES IS REQUIRED AT ALL WATER MAIN CROSSINGS WITH SANITARY SEWER OR STORM SEWER. <br />10. UTILITY SERVICES TYPICALLY TERMINATE 5' OUTSIDE BUILDING WALL UNLESS OTHERWISE SHOWN OR NOTED. <br />11. ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY. <br />12. ALL WATER LINES SHALL BE DUCTILE IRON WRAPPED IN POLYETHYLENE, CLASS 52 WITH 7.5' MINIMUM COVER. PROVIDE MINIMUM SEPARATION <br />OF 18" FROM SANITARY SEWER & STORM SEWER. INSULATE WATER MAIN IF LESS THAN 7.5' OF COVER. <br />13. INSULATION SHALL BE DOW STYROFOAM HI BRAND 35 OR EQUIVALENT, WITH 4 INCHES OF THICKNESS. <br />14. SANITARY SEWER PIPE OUTSIDE THE BUILDING ENVELOPE SHALL BE POLYVINYL CHLORIDE (PVC) SDR 35 OR 26. SDR 26 IS REQUIRED FOR <br />DEPTHS GREATER THAN 15 FEET. SANITARY SEWER PIPE WITHIN 5 FEET OF BUILDING AND UNDER FOOTINGS, PIPE SHALL BE PVC SCHEDULE <br />40. <br />15. STORM SEWER PIPE SHALL BE REINFORCED CONCRETE PIPE (CLASS 5 FOR PIPE DIAMETERS 18" AND SMALLER, CLASS 3 FOR PIPE DIAMETERS <br />21" AND LARGER UNLESS OTHERWISE NOTED) WITH R-4 GASKETS, OR HDPE STORM SEWER PIPE IF ALLOWED BY THE CITY. HDPE STORM PIPE <br />SHALL MEET REQUIREMENTS OF AASHTO M294. TYPE S WITH WATERTIGHT CONNECTIONS. SEE PLAN FOR LOCATIONS WHERE RCP IS REQUIRED. <br />PVC STORM SEWER PIPE SHALL BE SCHEDULE 40 PIPE. FLARED END SECTIONS SHALL BE RCP WITH TRASH GUARDS & RIP -RAP. <br />16. POST INDICATOR VALVES SHALL BE CLOW F-5750 (OR EQUIVALENT) MEETING AWWA STANDARD C509 AND CITY STANDARDS. VALVE TO BE <br />MECHANICAL JOINT RESILIENT WEDGE GATE VALVE. POST TO BE ADJUSTABLE FOR 8 FEET WATER MAIN DEPTH. THE ELECTRICAL ALARM SWITCH <br />SHALL BE PART NO. PCVS2 (OR EQUIVALENT). <br />17. AFTER CONSTRUCTION IS COMPLETED. THE CONTRACTOR SHALL PROVIDE THE OWNER WITH AN AS -BUILT RECORD OF UTILITY CONSTRUCTION. <br />THE AS -BUILT SHALL INCLUDE LOCATION AND LENGTH DEVIATIONS OR CHANGES TO THE PLAN. CONTRACTOR TO VERIFY WITH OWNER OR <br />ENGINEER WHETHER A PLAN WITH POST -CONSTRUCTION ELEVATIONS IS REQUIRED. <br />FINISH GRADE L OVERFLOW STORM SEWER MANHOLE OR CATCH BASIN. <br />NEENAH R-2561 BEEHIVE CASTING & FRAME. <br />VERIFY WITH STORM SEWER PLAN <br />3:1 <br />ORAIN1N.E/0VMft0W SECTION ' <br />4" DRAINTILE CONNECT TO STORM SEWER OR DAYLIGHT <br />TYPICAL BIO -FILTRATION /AREA <br />CROSS-SECTION <br />Utility Legend <br />— — — — <br />PROPERTY LINE <br />................................. — <br />LOT LINE <br />- — — — — — — - <br />EASEMENT LINE <br />CURB AND GUTTER <br />o--� <br />... <br />- - - - FM <br />SANITARY SEWER FORCE MAIN <br />solo <br />STORM SEWER <br />WATER MAIN <br />HYDRANT <br />.............------ ----------- - ...... CAS <br />GAS <br />................... ................... PW <br />UNDERGROUND ELECTRIC <br />...--.... %::.................... P+ <br />OVERHEAD ELECTRIC <br />me <br />UNDERGROUND TELEPHONE <br />................. ................... >nw <br />OVERHEAD TELEPHONE <br />FO" <br />TELEPHONE FIBER OPTIC <br />..:::................... cry <br />CABLE TELEVISION <br />General Utility Notes <br />1. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS <br />ARE BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND LIMITED MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION SHALL <br />NOT BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION AND <br />NOTIFY THE OWNER OR ENGINEER OF DISCREPANCIES. <br />2. ALL SANITARY SEWER, STORM SEWER AND WATER MAIN INSTALLATIONS SHALL BE PER MINNESOTA PLUMBING CODE AND IN ACCORDANCE WITH <br />THE CURRENT EDITION OF "STANDARD SPECIFICATIONS FOR WATER MAIN AND SERVICE LINE INSTALLATION AND SANITARY SEWER AND STORM <br />SEWER INSTALLATION AS PREPARED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA. <br />3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN THE NECESSARY FEDERAL, STATE AND LOCAL PERMITS FOR THE PROPOSED WORK <br />OR VERIFY WITH THE OWNER OR ENGINEER THAT PERMITS HAVE BEEN OBTAINED. PERMIT FEES SHALL BE THE RESPONSIBILITY OF THE <br />CONTRACTOR UNLESS OTHERWISE ARRANGED WITH THE OWNER. <br />4. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND DIMENSIONS OF DOORWAYS, RAMPS, TRUCK DOCKS, PRECISE <br />BUILDING DIMENSIONS AND EXACT BUILDING UTILITY CONNECTION LOCATIONS. <br />5. ALL PRIVATE UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE SPECIFICATIONS OF THE APPROPRIATE UTILITY COMPANY. THE <br />CONTRACTOR SHALL COORDINATE THE SERVICE LINE CONSTRUCTION WITH THE UTILITY COMPANIES. <br />6. CONTRACTOR SHALL OBTAIN ALL NECESSARY CITY PERMITS FOR UTILITY CONNECTIONS, AND UTILITIES SHALL BE INSPECTED AND APPROVED <br />BY THE CITY. THE CITY SHALL BE NOTIFIED 48 -HOURS PRIOR TO COMMENCING WITH THE UTILITY CONSTRUCTION OR ANY REQUIRED TESTING. <br />CONTRACTOR SHALL NOT OPERATE, INTERFERE WITH, CONNECT ANY PIPE OR HOSE TO, OR TAP ANY WATER MAIN BELONGING TO THE CITY <br />UNLESS DULY AUTHORIZED TO DO SO BY THE CITY. ANY ADVERSE CONSEQUENCES OF SCHEDULED OR UNSCHEDULED DISRUPTIONS OF <br />SERVICE TO THE PUBLIC ARE TO BE THE RESPONSIBILITY OF THE CONTRACTOR. <br />7. WATER MAIN LENGTHS AS SHOWN ARE APPROXIMATE HORIZONTAL LENGTHS. ALLOW FOR ADDITIONAL PIPE WHEN INSTALLING ON SLOPES OR <br />WHEN DEFLECTIONS ARE REQUIRED. THE JOINT DEFLECTIONS SHALL NOT EXCEED THE MAXIMUM RECOMMENDED BY THE PIPE MANUFACTURER <br />OR BY LOCAL GOVERNING SPECIFICATIONS. FITTINGS REQUIRED TO CONSTRUCT WATER MAIN SHALL BE INCLUDED IN WATER MAIN <br />CONSTRUCTION. <br />8. PROVIDE WATER MAIN THRUST RESTRAINTS PER CITY STANDARD REQUIREMENTS. <br />9. A MINIMUM VERTICAL SEPARATION OF 18 INCHES IS REQUIRED AT ALL WATER MAIN CROSSINGS WITH SANITARY SEWER OR STORM SEWER. <br />10. UTILITY SERVICES TYPICALLY TERMINATE 5' OUTSIDE BUILDING WALL UNLESS OTHERWISE SHOWN OR NOTED. <br />11. ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY. <br />12. ALL WATER LINES SHALL BE DUCTILE IRON WRAPPED IN POLYETHYLENE, CLASS 52 WITH 7.5' MINIMUM COVER. PROVIDE MINIMUM SEPARATION <br />OF 18" FROM SANITARY SEWER & STORM SEWER. INSULATE WATER MAIN IF LESS THAN 7.5' OF COVER. <br />13. INSULATION SHALL BE DOW STYROFOAM HI BRAND 35 OR EQUIVALENT, WITH 4 INCHES OF THICKNESS. <br />14. SANITARY SEWER PIPE OUTSIDE THE BUILDING ENVELOPE SHALL BE POLYVINYL CHLORIDE (PVC) SDR 35 OR 26. SDR 26 IS REQUIRED FOR <br />DEPTHS GREATER THAN 15 FEET. SANITARY SEWER PIPE WITHIN 5 FEET OF BUILDING AND UNDER FOOTINGS, PIPE SHALL BE PVC SCHEDULE <br />40. <br />15. STORM SEWER PIPE SHALL BE REINFORCED CONCRETE PIPE (CLASS 5 FOR PIPE DIAMETERS 18" AND SMALLER, CLASS 3 FOR PIPE DIAMETERS <br />21" AND LARGER UNLESS OTHERWISE NOTED) WITH R-4 GASKETS, OR HDPE STORM SEWER PIPE IF ALLOWED BY THE CITY. HDPE STORM PIPE <br />SHALL MEET REQUIREMENTS OF AASHTO M294. TYPE S WITH WATERTIGHT CONNECTIONS. SEE PLAN FOR LOCATIONS WHERE RCP IS REQUIRED. <br />PVC STORM SEWER PIPE SHALL BE SCHEDULE 40 PIPE. FLARED END SECTIONS SHALL BE RCP WITH TRASH GUARDS & RIP -RAP. <br />16. POST INDICATOR VALVES SHALL BE CLOW F-5750 (OR EQUIVALENT) MEETING AWWA STANDARD C509 AND CITY STANDARDS. VALVE TO BE <br />MECHANICAL JOINT RESILIENT WEDGE GATE VALVE. POST TO BE ADJUSTABLE FOR 8 FEET WATER MAIN DEPTH. THE ELECTRICAL ALARM SWITCH <br />SHALL BE PART NO. PCVS2 (OR EQUIVALENT). <br />17. AFTER CONSTRUCTION IS COMPLETED. THE CONTRACTOR SHALL PROVIDE THE OWNER WITH AN AS -BUILT RECORD OF UTILITY CONSTRUCTION. <br />THE AS -BUILT SHALL INCLUDE LOCATION AND LENGTH DEVIATIONS OR CHANGES TO THE PLAN. CONTRACTOR TO VERIFY WITH OWNER OR <br />ENGINEER WHETHER A PLAN WITH POST -CONSTRUCTION ELEVATIONS IS REQUIRED. <br />FINISH GRADE L OVERFLOW STORM SEWER MANHOLE OR CATCH BASIN. <br />NEENAH R-2561 BEEHIVE CASTING & FRAME. <br />VERIFY WITH STORM SEWER PLAN <br />3:1 <br />ORAIN1N.E/0VMft0W SECTION ' <br />4" DRAINTILE CONNECT TO STORM SEWER OR DAYLIGHT <br />TYPICAL BIO -FILTRATION /AREA <br />CROSS-SECTION <br />Utility Legend <br />— — — — <br />PROPERTY LINE <br />................................. — <br />LOT LINE <br />- — — — — — — - <br />EASEMENT LINE <br />CURB AND GUTTER <br />...................:::>, ...............:.,...:. ►-0 <br />SANITARY SEWER <br />- - - - FM <br />SANITARY SEWER FORCE MAIN <br />solo <br />STORM SEWER <br />WATER MAIN <br />HYDRANT <br />.............------ ----------- - ...... CAS <br />GAS <br />................... ................... PW <br />UNDERGROUND ELECTRIC <br />...--.... %::.................... P+ <br />OVERHEAD ELECTRIC <br />me <br />UNDERGROUND TELEPHONE <br />................. ................... >nw <br />OVERHEAD TELEPHONE <br />FO" <br />TELEPHONE FIBER OPTIC <br />..:::................... cry <br />CABLE TELEVISION <br />►►► <br />DRAIN TILE <br />►� <br />GATE VALVE <br />® <br />FLARED END SECTION (WITH RIPRAP) <br />LIGHT POLE <br />VERTICAL UTILITY SEPARATION <br />• <br />CLEANOUT <br />• <br />CURB STOP <br />_W <br />Westwood <br />Westwood Professional Servicer. Inc. <br />7699 Anagram Drive <br />Eden Prairie, MN 55344 <br />PHONE 952-937-5150 <br />FAX 952 937-5822 <br />TOLL FREE 1-889.937-5150 <br />www weshmodps corn <br />Dndsne& GAL/PDB <br />C%ecke& GAL/PDB <br />Drawn: PAG <br />Rewrd Dnwing by/dahz <br />Revidwx <br />0 - 5/4/09 - City Submittal <br />1 - 5/22/09 -City Comments <br />I hffeby artliy that this plea was propered by me or under my <br />direct atpervietm .aa that I em a duly homed PROPEISS ,TAI. <br />ffi GM= under dw lews of the sane of >Y�meoa. <br />Qmftb t A. Landini <br />Dag 5/22/09 ><am No. 43019 <br />Prepared fir. <br />Arden PlazaLLC <br />4255 White Hear Parkway, Suite 1550 <br />White Bear Lake, Minnesota 55110 <br />Arden Plaza <br />Redevelopment <br />Arden Hills, MN <br />X <br />Utility Plan <br />tc 5/4/09 <br />0' 50' 100' 150' <br />NOT FOR CONSTRUCTION sheet: 9 of <br />13 20091044UTP01.dwg <br />