Laserfiche WebLink
<br />Safe Routes to School Project/DNR Project Update - 06/09/09 <br /> <br />. Hydraulic Modeling <br />o Generating revised existing and proposed conditions floodway model <br />o All modeling outputs are included in CLOMR appendices. <br />· Floodplain W orkmaps <br />o Generating revised existing and proposed conditions FEMA regulatory <br />floodplain workmaps. <br />o W orkmaps included as appendix in CLOMR. <br />. FEMA Forms <br />o The appropriate FEMA forms must be completed and attached to the <br />CLOMR. <br />. CLOMR Document <br />o Report includes understanding of existing hydrology and hydraulics of <br />study area, description of the proposed improvements, assumptions made <br />in the modeling of those improvements, and summary of the impact the <br />proposed improvements has on the floodplain and floodway. <br />Typical fees for preparing a CLOMR application, conducting the required modeling, <br />providing coordination with DNR and FEMA, and providing additional information as <br />requested, is $7,500. <br /> <br />The primary steps in completing a LOMR include: <br /> <br />. Coordinate As-built Survey <br />o We have assumed City staffwill complete an as-built survey of the project <br />improvements. <br />o Kimley- Horn will work with City staff to produce an as-built plan <br />verifying the improvements were built as specified within the CLOMR. <br />. FEMA Forms <br />o The appropriate FEMA forms will need to be re-submitted with the <br />LOMR. <br />. LOMR Document <br />o The report text will be updated showing the proposed improvements as <br />completed and the new LOMR document will be submitted. <br /> <br />Assuming the proposed improvements are constructed consistent with the plan submitted <br />with the CLOMR, typical fees for preparing a LOMR application, providing coordination <br />with DNR and FEMA, and providing additional information as requested, is $2,500. <br /> <br />Permit Coordination <br />Given the number of permits required for this project, it is anticipated that there will be time <br />needed to coordinate with each agency regarding submittals, reviews, additional information <br />needs, and updates. This additional cross coordination between agencies may require up to <br />$4,000 before all permits are issued. <br /> <br />Plan Preparation and Coordination <br />Based on the submittal requirements of the RCWD, DNR, FEMA and the COE, the City's plan <br />set needs additional notes and details added. The following describes a number of the additional <br />items that are needed: <br /> <br />. Pathway Design Coordination <br /> <br />5 <br />