Laserfiche WebLink
<br />Safe Routes to School Project/DNR Project Update - 06/09/09 <br /> <br />o Coordination of North Pathway design with hydraulic modeling to be included in <br />CLOMR and RCWD submittals. <br />. Erosion Control Plan Coordination <br />o Coordination with City design staff to update plan sheets showing erosion control <br />devices and plans consistent with agency expectations. <br />. Culvert Design Plans <br />o Kimley-Horn will provide the City with the following plan sheets to insert into <br />plan set and project documents. <br />· Three (3) Modified Mn/DOT Standard Culvert Template Sheets <br />· General Plan and Elevation Sheet <br />· Railing Detail Sheet <br />The effort needed to continue this coordination effort and produce the culvert plans is expected <br />to require $12,500. <br /> <br />Permit Application Fees <br />The following permit fees have been identified for this project. <br />· FEMA Conditional Letter of Map Revision - $4,400 <br />· Rice Creek Watershed District - No Permit Fee <br />· Army Corps of Engineers - No Permit Fee <br />. Minnesota DNR -$500 <br />. FEMA Letter of Map Revision - $4,800 <br /> <br />Final Design Cost Summary <br /> Kimley- Horn Permit fees <br />Wetland Replacement N/A $12,000 <br />CLOMR $7,500 $4,400 <br />LOMR $2,500 $4,800 <br />Plan preparation & coordination $12,500 N/A <br />Permit Coordination $4,000 $500 <br /> $26,500.00 $21,700.00 <br /> <br />To date, Engineering costs for this project have been $34,868.65, of which $4,509.71 were for <br />the Perry Park portion of the project. Typically Engineering fees run between 15 to 20% of <br />project cost. For estimating purposes, staffuses 17% for these fees. <br /> <br />BUDGET <br />The following is a breakdown of the budget for the Elmer L. Andersen Memorial Trail: <br /> <br />SUMMARY OF PROJECT COSTS <br /> <br /> SRTS Estimate Perry Park Estimate <br />Pathway Construction $179,921.00 $50,500 <br />Retaining Walls $66,675.00 $28,270 <br />Driveway Gates $20,000.00 $0 <br />Drainage $95,305.00 $6,700 <br />Crosswalks $1,800.00 $0 <br />Crosswalk signals $15,000.00 $0 <br />Hydrant relocation $50,175.00 $0 <br /> <br />6 <br />