My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1A, Safe Routes to School Project
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
06-15-09-WS
>
1A, Safe Routes to School Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2024 10:09:16 AM
Creation date
6/12/2009 11:10:31 AM
Metadata
Fields
Template:
General
Document
Safe Routes to School Project
General - Type
Safe Routes to School Project
Date
6/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Safe Routes to School Project/DNR Project Update—06/09/09 <br /> o All modeling outputs are included in CLOMR appendices. <br /> • Floodplain Workmaps <br /> o Generating revised existing and proposed conditions FEMA regulatory <br /> floodplain workmaps. <br /> o Workmaps included as appendix in CLOMR. <br /> • FEMA Forms <br /> o The appropriate FEMA forms must be completed and attached to the <br /> CLOMR. <br /> • CLOMR Document <br /> o Report includes understanding of existing hydrology and hydraulics of <br /> study area, description of the proposed improvements, assumptions made <br /> in the modeling of those improvements, and summary of the impact the <br /> proposed improvements has on the floodplain and floodway. <br /> Typical fees for preparing a CLOMR application, conducting the required modeling, <br /> providing coordination with DNR and FEMA, and providing additional information as <br /> requested, is $7,500. <br /> The primary steps in completing a LOMR include: <br /> • Coordinate As-built Survey <br /> o We have assumed City staff will complete an as-built survey of the project <br /> improvements. <br /> o Kimley-Horn will work with City staff to produce an as-built plan <br /> verifying the improvements were built as specified within the CLOMR. <br /> • FEMA Forms <br /> o The appropriate FEMA forms will need to be re-submitted with the <br /> LOMR. <br /> • LOMR Document <br /> o The report text will be updated showing the proposed improvements as <br /> completed and the new LOMR document will be submitted. <br /> Assuming the proposed improvements are constructed consistent with the plan submitted <br /> with the CLOMR, typical fees for preparing a LOMR application, providing coordination <br /> with DNR and FEMA, and providing additional information as requested, is $2,500. <br /> Permit Coordination <br /> Given the number of permits required for this project, it is anticipated that there will be time <br /> needed to coordinate with each agency regarding submittals, reviews, additional information <br /> needs, and updates. This additional cross coordination between agencies may require up to <br /> $4,000 before all permits are issued. <br /> Plan Preparation and Coordination <br /> Based on the submittal requirements of the RCWD, DNR, FEMA and the COE, the City's plan <br /> set needs additional notes and details added. The following describes a number of the additional <br /> items that are needed: <br /> • Pathway Design Coordination <br /> o Coordination of North Pathway design with hydraulic modeling to be included in <br /> CLOMR and RCWD submittals. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.