My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1A, Safe Routes to School Project
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
06-15-09-WS
>
1A, Safe Routes to School Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2024 10:09:16 AM
Creation date
6/12/2009 11:10:31 AM
Metadata
Fields
Template:
General
Document
Safe Routes to School Project
General - Type
Safe Routes to School Project
Date
6/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Safe Routes to School Project/DNR Project Update—06/09/09 <br /> • Erosion Control Plan Coordination <br /> o Coordination with City design staff to update plan sheets showing erosion control <br /> devices and plans consistent with agency expectations. <br /> • Culvert Design Plans <br /> o Kimley-Horn will provide the City with the following plan sheets to insert into <br /> plan set and project documents. <br /> • Three (3)Modified Mn/DOT Standard Culvert Template Sheets <br /> • General Plan and Elevation Sheet <br /> • Railing Detail Sheet <br /> The effort needed to continue this coordination effort and produce the culvert plans is expected <br /> to require $12,500. <br /> Permit Application Fees <br /> The following permit fees have been identified for this project. <br /> • FEMA Conditional Letter of Map Revision—$4,400 <br /> • Rice Creek Watershed District—No Permit Fee <br /> • Army Corps of Engineers—No Permit Fee <br /> • Minnesota DNR—$500 <br /> • FEMA Letter of Map Revision— $4,800 <br /> Final Design Cost Summary <br /> Kimley- Horn Permit fees <br /> Wetland Replacement N/A $12,000 <br /> CLOMR $7,500 $4,400 <br /> LOMR $2,500 $4,800 <br /> Plan preparation & coordination $12,500 N/A <br /> Permit Coordination $4,000 $500 <br /> $26,500.00 $21,700.00 <br /> To date, Engineering costs for this project have been $34,868.65, of which $4,509.71 were for <br /> the Perry Park portion of the project. Typically Engineering fees run between 15 to 20% of <br /> project cost. For estimating purposes, staff uses 17% for these fees. <br /> BUDGET <br /> The following is a breakdown of the budget for the Elmer L. Andersen Memorial Trail: <br /> SUMMARY OF PROJECT COSTS <br /> SRTS Estimate Perry Park Estimate <br /> Pathway Construction $179,921.00 $50,500 <br /> Retaining Walls $66,675.00 $28,270 <br /> Driveway Gates $20,000.00 $0 <br /> Drainage $95,305.00 $6,700 <br /> Crosswalks $1,800.00 $0 <br /> Crosswalk signals $15,000.00 $0 <br /> Hydrant relocation $50,175.00 $0 <br /> Construction Total $428,876.00 $85,470.00 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.