Laserfiche WebLink
<br />Capital Improvement Plan <br />City of Arden Hills, Minnesota <br /> <br />2010 thru2014 <br /> <br />Contact Public Works Director <br /> <br />Department Street Department <br /> <br />Project # <br /> <br />Type Operational Maintenance <br />Useful Life <br /> <br />Project Name 2012 Crackseal and Sealcoat <br /> <br />CategolJ' Streets: CrackseaJing & Sealeo <br /> <br />Priority nla <br /> <br />Total Project Cost $]00,000 <br /> <br />Description I <br /> <br />N. Hamline Frontage, Hamline to Ingerson <br />Ingerson Rd., Femwood to Hamline <br />Ingerson, F em wood to Lexington <br />Ingerson Ct., Ingerson to dead end <br />Femwood Ct., Ingerson to cuI de sac <br />Dunlap, Ingerson to dead end <br />Femwood St., Carlton to Ingerson <br />Carlton Dr., Tiller Ln to Tiner Ln <br />Tiller Ln, Cannon to Lexington <br />Cannon Ave., Tiller Ln to north end <br />Shoreline Ln, Co Rd D to dead end <br />Co Rd D, Lexington to Shoreline <br />Lake Ln, Edgewater to dead end <br />W. Edgewater, Lexington to dead end <br /> <br />Karth Lk Cir, Hamline to cuI de sac <br />Briarknoll Cir, Briarknoll Dr to cuI de sac <br />BriarknolI Dr, Snelling to Norma <br />Dawn Cir E, Norma to cuI de sac <br />Dawn Cir W, Norma to cuI de sac <br />Royal Ln, Norma to Floral Dr <br />Norma Ave, Briarknoll to Dawn Cir <br />Norma Ave, Dawn Cir to cuI de sac <br /> <br />Justification <br /> <br />I <br /> <br />Seal coats waterproof the surface to keep the pavement from becoming brittle, cracking, and prevent water from seeping through the pavement and <br />causing problems to the base material. Seal coats also provide low-severity crack sealing, and restore surface friction. It is a maintenance practice <br />to extend the life of pavement. Seal coating can be performed at any time in the life of a pavement and lasts an average of three to six years. <br /> <br />Expenditures <br />Construction/Maintenance <br /> <br />2010 <br /> <br />2011 <br /> <br />2012 <br />100,000 <br /> <br />100,000 <br /> <br />2013 <br /> <br />2014 <br /> <br />Total <br />100,000 <br /> <br />100,000 <br /> <br />Total <br /> <br />Produced Using the Plan-it Capital Planning Software <br /> <br />Thursday. June 11, 2()()9 <br />