My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1C, 5-Year PMP
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
06-15-09-WS
>
1C, 5-Year PMP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2024 11:10:33 AM
Creation date
6/12/2009 11:11:08 AM
Metadata
Fields
Template:
General
Document
5-Year PMP
General - Type
5-Year PMP
Date
6/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIP Discussion <br />6/12/2009 <br />Page 3 <br /> <br />2012 <br /> <br />Snelling Reconstruction-This project is driven by pavement condition. This segment of road is a <br />highly traveled roadway in Arden Hills, which has exceeded its pavement life. In order to better <br />understand the costs of this project, staff is recommending that a feasibility report be completed <br />in 2010. This will allow the City to better identify the proposed street width, pavement section, <br />and associated storm water needs. The feasibility report can be utilized for a reconstruction <br />project at any time and provide assistance in determining the appropriate year in which to budget <br />this. project. <br /> <br />2013 <br /> <br />Mill and Overlay- The streets recommended for this year, Chatham, Arden Oaks and Pine <br />Tree/Harriet neighborhoods, have a good structural base, but the pavement surface is aged. <br />There are no major utility concerns in any of these street segments, therefore, a mill and overlay <br />is the appropriate strategy to extend the life of these streets. <br /> <br />2014 <br /> <br />Ridgewood/Asbury Reconstruction- This project has been identified because of pavement <br />condition, the need for storm sewer, and watermain improvements. These streets are <br />approximately 50 years old and have exceeded their useful pavement life. There is a minimal <br />storm sewer system in this neighborhood. Given the proximity of the area to Lake Johanna, <br />storm water improvements are critical to improve the water quality of the runoff reaching the <br />lake. Public Works have also expressed concerns about the condition of the watermain. There <br />have been three watermain breaks along Edgewater in the past 10 years; the condition of the <br />pipes will need to be closely evaluated to determine the extent of improvements needed. <br /> <br />Summary <br /> <br />While the City Council may determine the timing of the projects is too aggressive, it is important <br />for the City Council to have the information regarding these projects. Staff is requesting that the <br />City Council review the projects proposed and discuss the staffs recommended 5 year CIP. <br /> <br />CONCLUSION <br />Staff is requesting direction from the City Council regarding the 2010-2014 PMP 5-Year CIP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.