My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1C, 5-Year PMP
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
06-15-09-WS
>
1C, 5-Year PMP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2024 11:10:33 AM
Creation date
6/12/2009 11:11:08 AM
Metadata
Fields
Template:
General
Document
5-Year PMP
General - Type
5-Year PMP
Date
6/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIP Discussion <br />6/12/2009 <br />Page 2 <br /> <br />Council initiate any of the PMP projects, staff will review the conditions in the field to verify <br />that the project is being implemented at the appropriate time. <br /> <br />A summary spreadsheet of the Pavement Condition Index (PCI) survey completed by <br />GoodPointe Technologies is attached; this spreadsheet provides ratings for both 2008 and 2005. <br /> <br />A map showing the history ofwatermain breaks is also attached. This map is not yet complete; <br />records for breaks prior to 2004 were not maintained in a central location. Staff is continuing to <br />review historical records and will update this map as additional information is found. <br /> <br />2010 <br /> <br />Valentine Reconstruction- This project was identified because of both poor pavement condition <br />and drainage issues. The neighborhood has an insufficient storm sewer system, which has <br />caused drainage issues on private property. Street ponding has also occurred as a result of this <br />minimal storm sewer system, which has accelerated the street deterioration. <br /> <br />Katie Lane/Katie Court Mill and Overlay- This project was carried over from 2009. The intent <br />was to complete the mill and overlay in conjunction with the wear course of the extension of <br />Katie Lane. Staff will be meeting with the developer to discuss timing of this project. <br /> <br />2011 <br /> <br />Nursery Hill/Wyncrest/Arden View Mill and Overlay- Concerns were brought to staff that the <br />sealcoat in the Nursery Hill/Wyncrest neighborhoods was not applied properly and the sealcoat <br />was peeling. Staff examined the conditions in the field, and determined that the pavement had <br />significantly oxidized and dried out prior to the sealcoat application. The sealcoat was effective; . <br />however, the resulting "peeling" is a result of dry pavement. Staff recommends these <br />neighborhoods be programmed for a mill and overlay. Given the proximity of Karth Lake, staff <br />also recommends storm sewer improvements to improve water quality. Reducing the size of the <br />quasi- cul- de- sacs throughout the neighborhood would also improve water quality by <br />decreasing the amount of impervious surfaces present. <br /> <br />Arden View Court and Arden View Drive are showing signs of pavement deterioration that <br />would not be remedied by a mill and overlay; a full depth mill is the recommended maintenance <br />strategy. There is a significant history of breaks in the Arden View Townhome area, as shown <br />on the watermain break map. Only a portion of the watermain is under the roadway; the majority <br />is located under private drives and in green space between buildings. Staff recommends <br />replacing the segments under the roadway as a part of a PMP project, and evaluating trenchless <br />technology to determine the most cost-effective solution for replacing the remainder of the <br />watermain. <br />
The URL can be used to link to this page
Your browser does not support the video tag.