My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4E, Planning Case 09-009 - Bethel Drive
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
06-29-09-R
>
4E, Planning Case 09-009 - Bethel Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2009 9:49:08 AM
Creation date
6/26/2009 9:45:05 AM
Metadata
Fields
Template:
General
Document
Planning Case 09-009 - Bethel Drive
General - Type
Planning Case 09-009 - Bethel Drive
Date
6/29/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.- <br />~"HlEES <br /> <br />MEMORANDUM <br /> <br />DATE: June 29, 2009 <br /> <br />TO: Mayor & City Council <br /> <br />FROM: Meagan Beekman, City Planner <br /> <br />SUBJECT: Planning Case #: 09-009 <br />Conditional Use Permit Amendment <br />AT&T (Ken Nielsen) <br />3900 Bethel Drive <br /> <br />Request <br /> <br />Approve Planning Case 09-009 for a Conditional Use Permit Amendment at 3900 Bethel Drive <br />Based on the Findings of Fact and the Submitted Plans as Amended by the Five Conditions in <br />the June 29, 2009, Memo to the City Council. <br /> <br />Back2round <br /> <br />The applicants have requested a Conditional Use Permit (CUP) for AT&T to install a cellular <br />tower and adjacent equipment shed on the Bethel University campus at 3900 Bethel Drive. The <br />tower and equipment shed would be located on the southeast side of the parking lot immediately <br />adjacent to the recently added East Lot parking area (approved through Planning Case 07-022), <br />approximately 170 feet from the eastern property line abutting Trunk Highway 51. Please see <br />Attachment D for an aerial of the site. <br /> <br />AT&T is seeking to lease a tract measuring 20 feet by 35 feet (700 square feet) that would <br />contain the cellular tower and equipment shed. The cellular tower would be designed as a simple <br />pole that would be 75 feet tall with an eight foot tall wooden fence encircling the base, both <br />painted dark brown. Although the Zoning Code typically limits fences to a maximum height of <br />six feet, the needed security and fairly isolated location enables an exception to this regulation. <br />Canister stealth skin would be utilized along the highest 15 feet of the tower to conceal the <br />antennas inside (the number of antennas on this tower has not been specified). Adjacent to the <br />south would be a 16 by ten foot (160 square foot) equipment shed measuring ten feet in height. <br /> <br />Metro-inet\ardenhi/ls \Admin \CouncillAgendas & Packet Information 12009\06-29-09 - Regular Meeting - Planning <br />Case 09-009 <br /> <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.