Laserfiche WebLink
<br />The equipment shed would be constructed of tan-colored brick. A four-foot retention wall of <br />unspecified design would partially encircle the lease tract as seen on the site plan (Attachment <br />D). <br /> <br />For clarification, the lease agreement would be between Bethel University and AT&T Mobility. <br />The City of Arden Hills would not receive any payments as part of this agreement. <br /> <br />The applicant has submitted an application, project letter, site plan, elevations, and site survey <br />(Attachments D). <br /> <br />Staff did amend proposed condition number 5 after the Planning Commission meeting. The <br />previous language referenced the possibility of the City requiring the tower to be painted a <br />different color after it was installed. The City would still be able to require additional screening <br />measures if needed, but upon further discussions with the applicant, discovered that repainting <br />the tower once it is in place is not feasible. Given that the color of the tower is proposed to be <br />the same as the existing light poles on the site staff feels that the color of the tower is no longer <br />an Issue. <br /> <br />Staff received two emails from residents after the Planning Commission packets were sent out. <br />These have been included as Attachment C to this report. <br /> <br />Findin2S of Fact <br /> <br />The Planning Commission offers the following twenty-one findings of fact for review: <br /> <br />General Findings: <br />1. The area of the lease tract, including the tower and adjacent equipment shed, would be <br />700 feet (35' x 20'). <br />2. The proposed tower would have a height of75 feet, the maximum allowed in the Zoning <br />Code. The antennas would occupy the top 15 feet of the tower. <br />3. The adjacent equipment shed would be 160 square feet (16' x 10') with a height often <br />feet. <br />4. A four foot retaining wall would be built around the east side and portions of the north <br />and south sides of the lease tract. <br />5. The tower would be at least partially screened from adjacent properties by trees to the <br />east and south. <br />6. The City would not be party to the lease agreement and would not own or be responsible <br />for maintaining the equipment shed. <br />7. The site is a minimum of 170 feet from the closest property line (to the east) and is <br />located adjacent to the smallest of the four eastern campus parking lots. This site appears <br />to have been selected with regard to decreasing obtrusiveness to adjacent properties and <br />public streets. <br /> <br />Metro-inet\ardenhills\Admin\CouncilIAgendas & Packet Information 12009\06-29-09 - Regular Meeting - Planning <br />Case 09-009 <br /> <br />Page 2 of4 <br />