Laserfiche WebLink
Partial Pay Estimate o.: <br />2009 PAVEMENT MANAGEMENT PROGRAM <br />CITY OF ARDEN HILLS MINNESOTA <br />BMI PROJECT NO.: T16.100326 <br />ITEM <br />NO. <br />RK COMPLETED THROUGH 913109 <br />ITEM <br />MOBILIZATION <br />CLEAR AND GRUB TREE <br />TREE - 2.5" CAL, B&B <br />REMOVE EXISTING CONCRETE CURB AND GUTTER <br />REMOVE CONCRETE PAVEMENT <br />REMOVE BITUMINOUS PAVEMENT - ROADWAY AND CURBING <br />REMOVE BITUMINOUS PAVEMENT- DRIVEWAY <br />REMOVE DRAINAGE STRUCTURE <br />REMOVE STORM SEWER PIPE <br />REMOVE HYDRANT <br />REMOVE VALVE <br />SALVAGE AND REINSTALL BRICK PAVERS <br />SALVAGE AND REINSTALL SPLIT RAIL FENCE <br />COMMON EXCAVATION <br />SUBGRADE EXCAVATION <br />SELECT GRANULAR BORROW <br />GEOTEXTILE FABRIC - WOVEN TYPE 5 <br />TOPSOIL BORROW <br />EXPLORATORY EXCAVATION <br />DITCH CLEANING AND REGRADING <br />AGGREGATE BASE CLASS 5 <br />BITUMINOUS WEAR COURSE- 3" DRIVEWAYS LV4 <br />BITUMINOUS (NEAR COURSE- STREETS LV4 <br />BITUMINOUS NON -WEAR COURSE- STREETS LV3 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />4" PERFORATED P.E. EDGE DRAIN <br />4" PVC PIPE DRAIN CLERK -OUT <br />P.E. YARD DRAIN <br />1211RC PIPE SEWER CL V DESIGN 3006 STORM <br />15"" RC PIPE SEWER CL V DESIGN 3006 (STORM) <br />18" RC PIPE SEWER CL V DESIGN 3006 (STORM) <br />21" RC PIPE SEWER CL III DESIGN 3006 (STORM) <br />12" RC PIPE APRON W/ TRASH GUARD <br />15" RC PIPE APRON WJ TRASH GUARD <br />21" RC PIPE APRON W1 TRASH GUARD <br />CONNECT TO EXISTING STORM STRUCTURE <br />CONNECT TO EXISTING STORM SEINER PIPE <br />CONNECT TO EXISTING SANITARY SEWER PIPE <br />CONNECT TO EXISTING SANITARY SEINER SERVICE PIPE <br />CONNECT TO EXISTING SANITARY SEINER MANHOLE <br />4" SANITARY PVC SEINER PIPE <br />8" SANITARY PVC SEINER PIPE <br />10" SANITARY PVC SEINER PIPE <br />10"X4" PVC WYE <br />HYDRANT <br />LOWER HYDRANT <br />UNIT <br />PRICE <br />$46, 071.43 <br />$311.00 <br />$441.00 <br />$3.00 <br />$2.20 <br />$2.13 <br />$279.00 <br />$10, 00 <br />$311.00 <br />$249.00 <br />$4.45 <br />$23.00 <br />$6.49 <br />$4.87 <br />$4.55 <br />$0.85 <br />$8.90 <br />$363.00 <br />$170.00 <br />$7,50 <br />$18.42 <br />$69.24 <br />$51.07 <br />$2.04 <br />$6.84 <br />$,103.00 <br />$155.00 <br />$30.35 <br />$31.78 <br />$44.61 <br />$57.43 <br />$598.57 <br />$679.26 <br />$975.48 <br />$541.37 <br />$367.72 <br />$960.16 <br />$633.30 <br />$1,082.73 <br />$51.07 <br />$115.98 <br />$119.05 <br />$245.15 <br />$2 982.61 <br />$1.021.45 <br />AS BID <br />ESTIMATED <br />QUANTITY <br />1.00 LUMP SUM <br />12 EACH <br />12 EACH <br />57 LIN FT <br />1,014 SO YD <br />23,320 SQ YD <br />700 SQ YD <br />27 EACH <br />707 LIN FT <br />3 EACH <br />3 EACH <br />150 SQ FT <br />50 LIN FT <br />11 392 CU YD <br />1 901 CU YD <br />1,901 CU YD <br />12,303 SQ YD <br />6,384 CU YD <br />45 HOUR <br />40 HOUR <br />8,576 CU YD <br />647 SQ YD <br />2,328 TON <br />2,328 TON <br />1,414 GAL <br />2,293 LIN FT <br />12 EACH <br />2 EACH <br />788 LIN FT <br />97 LIN FT <br />30 LIN FT <br />26 LIN FT <br />4 EACH <br />2 EACH <br />1 EACH <br />3 EACH <br />13 EACH <br />9 EACH <br />2 EACH <br />1 EACH <br />12 LIN FT <br />29 LIN FT <br />65 LIN FT <br />2 EACH <br />3 EACH <br />21 LIN FT <br />ESTIMATED <br />AMOUNT <br />$46,071.43 <br />$3,732,00 <br />$5,292.00 <br />$171.00 <br />$2,230.80 <br />$16,790.40 <br />$1,491.00 <br />$7,533.00 <br />$7,070.00 <br />$933.00 <br />$ 747.00 <br />$667-50 <br />$1,150.00 <br />$73,934.08 <br />$9,257.87 <br />$ 8, 649.55 <br />$104457.55 <br />- .. . <br />$56,817.60 <br />$1 fi 335.00 <br />$6, 800.00 <br />$64,320.00 <br />$11,917.74 <br />$137,910.72; <br />$118,890, 96 I <br />$2,884.56 <br />$115,684.12 <br />$1 236.00 <br />$310.00 <br />$23,915.80 <br />$3 082.66 <br />$1 338.30 <br />$1,493.18 <br />$2, 394.28 <br />$1, 358.52 <br />$975A8 <br />$1,624.11 <br />$4,780,36 <br />$8 641.44 <br />$1, 266.60 <br />$1,082.73 <br />$612.84 <br />$3,363.42 <br />$7 738.25 <br />$490,30 <br />$8, 947.83 <br />$1.532.18 <br />PREVIOUS ESTIMATE <br />ESTIMATED <br />QUANTITY <br />ESTIMATED <br />AMOUNT <br />0.55 LUMP SUM <br />^ $251339.29 <br />18 <br />EACH <br />$5,598.00 <br />EACH <br />63 <br />566 <br />LIN FT <br />SQ YD <br />$189,00 <br />$1,245.20 <br />23320 <br />SQ YD <br />$16,790.40 <br />892 <br />SQ YD <br />$1,899.96 <br />EACH <br />$8,928.00 <br />_---.._32 -- <br />729 <br />- . <br />LIN FT <br />$7,290.00 <br />1 <br />EACH <br />$311.00 <br />1 <br />EACH <br />$249.00 <br />99 <br />SO FT <br />$440.55 <br />25 <br />LIN FT <br />$575.00 <br />9694 <br />YD <br />$62,914.06 <br />677 <br />_CU <br />CU YD <br />$3,296.99 <br />077 <br />CU YD <br />$3,080.36 <br />1204 <br />SQ YD <br />$1,023.40 <br />801 <br />CU YD <br />$7,128,90 <br />HOUR <br />HOUR <br />6183 <br />CU YD�^ <br />$46,372.50 <br />487 <br />SQ YD <br />$8,970.54 <br />TON <br />1716 <br />TON <br />$87,636,12 <br />GAL <br />1682 <br />LIN FT <br />$11.504.88! <br />EACH <br />3 <br />EACH <br />$465.00 <br />827 <br />LIN FT <br />$25 099.45 <br />101 <br />LIN FT <br />$3,209.78 <br />48 <br />LIN FT <br />$2 141.28 <br />16 <br />LIN FT <br />$918.88 <br />3 <br />EACH <br />$1 795.71 <br />4 <br />EACH <br />$2 717.04 <br />1 <br />EACH <br />$975.48 <br />4 <br />EACH <br />$2165.48 <br />16 <br />EACH <br />$5 883.52 <br />11 <br />EACH <br />$10,561.76 <br />2 <br />EACH <br />$1,266.60 <br />1 <br />EACH <br />$1082.73 <br />4 <br />LIN FT <br />$204.28 <br />22 <br />LIN FT <br />$2 551.56 <br />76 <br />LIN FT <br />$9 047.80 <br />2 <br />EACH <br />$490.30 <br />1 <br />EACH <br />LIN FT <br />$2,982.61 <br />COMPLETED TO DATE <br />ESTIMATED <br />QUANTITY <br />ESTIMATED <br />AMOUNT <br />0.70 LUMP SUM <br />$32,260.00 <br />18 <br />EACH <br />$51598.00 <br />EACH <br />63 <br />592 <br />LIN FT <br />SQ YD <br />$189.00 <br />$1.302.40 <br />23320 <br />SO YD <br />$16,790.40 <br />900 <br />SQ YD <br />$1 917.00 <br />32 <br />EACH <br />729 <br />LIN FT <br />$7,290.00 <br />1 <br />EACH <br />$311,00 <br />1 <br />EACH <br />$249.00 <br />99 <br />SQ FT <br />$440.55 <br />50 <br />LIN FT, <br />$1,150.00, <br />11392 <br />CU YD <br />$ 731934.08 <br />806 <br />CU YD <br />$3,925.22 <br />806 <br />CU YD <br />$3,667.30 <br />1630 <br />SO- YD <br />$1, 385.50 <br />1 299 <br />CU YD <br />$11, 561.10 <br />HOUR <br />-' <br />13 <br />HOUR <br />$2,210.00 <br />8576 <br />CU YD <br />$64,320.00 <br />487 <br />SQ YD <br />$8,970.54 <br />TON <br />2436 <br />TON <br />$124 406.52 <br />GAL <br />1997 <br />LIN FT <br />$13 659.4a <br />8 <br />EACH <br />$824.00 <br />3 <br />EACH <br />$465.00 <br />827 <br />LIN FT <br />$25 099.45 <br />101 <br />LIN FT <br />$3 209.78 <br />48 <br />LIN FT <br />$2 141.28 <br />16 <br />LIN FT <br />$918.88 <br />3 <br />EACH <br />$1795.71 <br />4 <br />EACH <br />$2 717.04 <br />1 <br />EACH <br />$975.48 <br />4 <br />EACH <br />$2,165.48 <br />16 <br />EACH <br />$5 883.52 <br />11 <br />EACH <br />$10 561.76 <br />2 <br />EACH <br />$1 266.60 <br />1 <br />EACH <br />$1082,73 <br />4 <br />LIN FT <br />$204.28 <br />22 <br />LIN FT <br />$2 551.56', <br />76 <br />LIN FT <br />$9 047,80 <br />2 <br />EACH <br />$490.30 <br />1 <br />EACH <br />LIN FT <br />$2 982.61 <br />........ ......................_............................._..:.......:..::...:...._......................................................................................... ....... <br />