My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-16-08 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1999-2009
>
2008
>
12-16-08 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 12:10:53 AM
Creation date
10/13/2009 8:52:43 AM
Metadata
Fields
Template:
General
Document
PTRC Packet
General - Type
PTRC Packet
Date
12/16/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECOMMEND APPROVAL OF NATURAL RESOURCES MANAGEMENT PLAN <br /> John Moriarty reviewed the Natural Resources Management Plan (NRMP)with the <br /> commission members present. Comments made at the last Commission review have <br /> been incorporated into the plan. The NRMP goal is to create habitat for wildlife and rare <br /> species based on Minnesota DNR documentation. It was noted that a list of these <br /> species is not included in the plan. A list will be added. <br /> Guides to system wide natural resource management, as well as park/open space <br /> specific guidelines, are included in the plan. Chair Straumann requested that the NRMP <br /> more accurately reflect the newly-prepared Rice Creek North Regional Trail Wildlife _ <br /> Corridor Habitat Restoration Plan. These changes will be made before action by the <br /> County Board and the Wildlife Corridor Plan will be included as an appendix to the <br /> NRMP. <br /> The commission members present agreed the plan was acceptable; however, a motion <br /> was not taken due to a lack of quorum. Chair Straumann directed the NRMP be sent by <br /> mail to the commission members requesting comments and/or approval be <br /> communicated to staff. Approval by this method was acceptable to the Commission <br /> members present. <br /> UPDATE TAMARACK NATURE CENTER DESTINATION FOR DISCOVERY PLAN <br /> AND PLANNING SCHEDULE <br /> The Design Development document prepared by the design consultant, Partners and <br /> Sirny, is complete. The design team has been meeting to discuss the next steps in the <br /> process- additional design, project phasing and project funding. Priorities within phase <br /> one of the project include the Nature Play Area, Children's Garden and the Garden <br /> House. Based on the present estimates the cost of these elements is approximately <br /> $1.7m. Funding of$745,000 in State Bond funds is available at present. <br /> Ideas for organizing and obtaining additional funding, including forming a foundation to <br /> support development at Tamarack Nature Center and launching a capital campaign to <br /> raise funds to support the Destination for Discovery Master Plan have been discussed. <br /> A workshop has been scheduled with the County Board to review the design <br /> development plans and funding options. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.