Laserfiche WebLink
s � <br />� <br />- <br />�s� <br />i� <br />� ��ar�. t,� <br />2010 Pavement Mant�ge;neyzt Progrc�m <br />September 25, 2009 <br />Page 3 of 6 <br />Attenda�ce at rr�.eetin�s w�.ich shall include: <br />• Project kick-off m�eting to discuss project s�ope, schedule, and deliverables <br />� Attendance at up to two public information meetings �rior to the public hearing <br />� Attendance at the public hearing to present information and/or answer questions <br />3. Final Desi�n <br />Deliverables <br />• Final plans in accordance with State Aid and City standards, including: <br />— Title shee� <br />— Estimated quantities <br />— Co�struction details <br />— Typical sections <br />— Storm sewer/street p�an ar�d profiles <br />— Storm water management/water quaiity improvements <br />— Sanitary sewer/water�nain <br />— Erosion control/SWPPP <br />— Cross-sections (every 50 feet and at driveways) <br />• Project specifications, contract documents, and bidding doc�ments <br />� Permit applications/submittals provided to the City, including but not �imited to the following: <br />— RCVITD �permit) <br />—�Vlinnesota Pollution Control Agenc� (I��DES and SWPPP) <br />— Department of Natural Resources <br />— Min�esota Department of Health <br />— State Aid Plans will be submitted to the �innesota Department of Transportation <br />— Ramsey County Transportation <br />• Easement identi�.cation: <br />— V1Te �vill work to complete the improvements within the existing rig�t of �vay and easements; <br />however, we will identify ease�nent requirements as needed <br />• 4pin�on of probable cost <br />• Advertisement for bids, bid docum�nt distribution, contractor coordination, bid tabulation, and <br />contract award recommendation <br />• Final assessment roll <br />Ke�sues <br />• Continued private utility coordination <br />� Storm water management design and neighbor�hood coordination <br />• Design improvements to fit within the right of way <br />• Reviev� construction plans with the Cit� <br />