My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4H, Award 2010 PMP Project to WSB
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
10-12-09-R
>
4H, Award 2010 PMP Project to WSB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 9:48:43 AM
Creation date
10/13/2009 8:56:42 AM
Metadata
Fields
Template:
General
Document
Award 2010 PMP Project to WSB
General - Type
Award 2010 PMP Project to WSB
Date
10/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />��5� <br />� aS.�� t.� <br />4. Cons�ruc�ion 5ervices <br />. , <br />� <br />2010 Pavement Management Prograrri <br />Septe�ber 25, 2009 <br />Page 4 af b <br />�elive�a�les <br />• Canstruc�ion observation fo� 40-50 hours per �vee� during construction activity. �I1Te have assumed a <br />totai o� 1£ vveeks �f construction activity at 45 hours per vveek as part of flur fee, as speci�i�al�y <br />requ�sted in t�e RFQ. <br />� Daily reports, sub�nitted vvee�y t� the City <br />• Erosion control/S�iTPP� i�s�ect�on and mor�i�oring <br />•�egular cornn�ur�icatior� vv�th resider�ts to p�ovide infor�nation and answer �uestions <br />• Coorc�ination of materiais t�sti�g �testing firn� to contracr directly wi�h the City) <br />• Co�structio� staking ar�d sur�reying, including: <br />— L�ne and grade stakes for �tility irr��rovements, i�cluding �ut sheets <br />— Line and grade stakes for roadway cons�ruct�on, including cur�i s�a�es <br />— Informatio� �or record drawings, including top �ot of all hydrants, manhole rir�s, a�d rnanhole <br />inverts <br />� �or�struction ad�ninistration, including: <br />— Respond to t�es�gr� q�est�fl�s �-orn Ci� staff or resid�nts <br />—�repare and subr�it pa� estimates to ��e City <br />— Track�ng field r�otes and ���er documenta�ion <br />— �roject fil�ng a�t� general a�mi�istration <br />— Coo�dir�ate v�ee�ly construction rrieetings and prepare meet�ng m�r�utes <br />— Ass�stance wit� �ity neinrsl�tter and ot�er resident cor��unication <br />• As-�u��t recfl�-c� drav��ngs <br />��y �ssr�es <br />� Continued private utilit� coord�na�ion <br />� One-�n-or�e meeti�gs wi�h residents to i��ien�ent rain garder� plant�ng <br />•�ornm�nicarion w��� resider�ts to resolve cfl�str�ction issues as needed <br />Atrendar�ce �� rneet�ngs �hich s�all include - <br />• �re-consrr�ct�ior� co�fere�ce <br />+ Weekly constructio� mee�ings to dis�uss �ro�ect issues and schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.