My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7B, Resolution 2009-038
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2000-2009
>
2009
>
12-14-09-R
>
7B, Resolution 2009-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 2:40:16 PM
Creation date
12/16/2009 11:02:09 AM
Metadata
Fields
Template:
General
Document
2010 PMP
General - Type
Feasibility Report
Date
12/14/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. EXECUTIVE SUMMARY <br />The 2010 Pavement Management Prod ect includes the reconstruction of Valentine Avenue, <br />Valentine Court, and Valentine Crest Road; and a mill and overlay on Janet Court, Katie Lane, <br />and Katie Court. The project also includes storm drainage improvements and improvements to <br />the existing watermain and sanitary sewer. A map showing the project location can be- found on <br />Figure I in Appendix A. <br />The proposed project includes a State Aid funded option for Valentine Avenue (26 feet wide, <br />posted no parking) and a non State Aid funded option of 24 feet wide. It also includes. <br />reconstructing Valentine Court and Valentine Crest Road to their existing widths of 24 feet and <br />28 feet wide. Stormwater management will be provided using the existing drainage system and <br />adding catch basins to improve drainage. Drainage improvements will be completed to meet the <br />requirements of the Rice Creek Watershed District (RCWD). <br />Watermain improvements include replacement of existing lines that have a frequent break <br />history and require maintenance. Sanitary sewer improvements include casting adjustments to <br />accommodate the roadway reconstruction and spot replacement of sags or other pipe <br />deficiencies. <br />The proposed improvement cost is estimated to be $1,135,423 which includes contingencies and <br />overhead costs. Funding for the project will be provided through assessments to benefiting <br />properties, sanitary sewer utility funds, watermain utility funds, surface water management <br />utility funds, Permanent Improvement Revolving (PIR) funds, and State Aid funds. <br />The proposed project schedule includes beginning construction in. May -June 2010, with final <br />completion by October 1, 2010. <br />This project is feasible, necessary, and cost-effective from an engineering standpoint and should <br />be constructed as proposed herein. <br />Feasibility Report <br />2010 Pavement Management Program <br />City of Arden Hills, MN <br />WSB Project No. 1771-02 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.