My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1A, Engineering 2009 Year End Review
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
02-08-10-WS
>
1A, Engineering 2009 Year End Review
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 12:43:07 AM
Creation date
2/8/2010 3:02:36 PM
Metadata
Fields
Template:
General
Document
Engineering 2009 Year End Review
General - Type
2009 Year End Review & 2010 Work Plan
Date
2/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2010 Work Plan <br /> PROJECTS <br /> Project Project Name Priority(H/M/L) Project Technical <br /> Number Manager Assistance <br /> 06-10 Infiltration and Inflow GH RV <br /> 06-13 2006 PMP, Ridgewood Neighborhood KG RV <br /> 07-02 2008 Rain Garden Project KG RV <br /> 07-07 2007 PMP Mill&Overlay KG RV <br /> 07-09 TCAAP KG WSB/SRF/Barr <br /> 07-15 Hazelnut Park Third Addition KG RV <br /> 07-19 Arden Plaza KG NA <br /> 08-07 2009 PMP,Glenarden Neighborhood KG BMI <br /> 08-19 Ramsey Count 10/96Improvements KG BMI <br /> I-694/Hwy 10 Noise Issues KG Consultant <br /> 08-20 CP Rail/Trail Improvements KG BMI <br /> 08-21 Valentine Lake Subwatershed Drainage Study/Improvements KG WSB <br /> 09-14 CR E/TH 51 Pathway/Bridge Improvements KG KH <br /> 10-07 2010 PMP KG WSB <br /> 10-09 2010 Sewer Lining project KG RV <br /> 10-11 Mn/DOT I-694/TH51/Hamline project KG Consultant <br /> 10-14 Elmer L Andersen Memorial Trail Connections(ARRA project) KG RV <br /> 09-06/09-07) CR E-2, Perry Park <br /> 10-19 Lexington Avenue Trail Construction and Resurfacing KG Consultant <br /> Railroad tracks to Grey Fox-new construction <br /> Cummings Park Dr to Co Rd F-resurfacing <br /> AHATS Site Plan Review KG <br /> 2010 Crack Seat and Sealcoat KG RV <br /> 2011 PMP Wyncrest/Nursery Hill KG Consultant <br /> Snelling Avenue-preliminary engineering KG Consultant <br /> Storm Pond Maintenance KG Consultant <br /> Surface Water Management Plan Update 2010-2011 KG Consultant <br /> Mn/DOT I-35W Mill and Overlay 1-694 to Lake Drive KG RV <br /> CORE ENGINEERING SERVICES <br /> Project Name Priority(H/M/L) Project Technical <br /> Mana er Assistance <br /> Capital Improvement Plan CIP Development KG RV <br /> General Engineering/Information/Support KG RV <br /> State Aid Reporting KG RV <br /> Staff meetings KG NA <br /> GIS Mapping KG RV <br /> Planning Case Reviews KG NA <br /> 2004 PMP KG RV <br /> 2005 PMP KG RV <br /> SWPPP GH RV <br /> Erosion Control Permits KG RCD <br /> As-built Management KG AH/RV <br /> Project File Management KG AH <br /> Infrastructure inventory-watermain KG AH/RV <br /> Infrastructure inventory-sanitary KG AH/RV <br /> Infrastructure inventory-storm sewer KG AH/RV <br /> AH Arden Hills Staff Support KH Kimley-Horn and Associates, Inc. <br /> Barr Barr Engineering NA No additional assistance <br /> BMI Bolton&Menk, Inc. RCD Ramsey Conservation District <br /> Consultant requires an RFP for consulting services RV Roseville Engineering Staff Support <br /> GH Greg Hoag SRF SRF Consulting, Inc. <br /> KG Kristine Giga WSB WSB&Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.