My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1A, TCAAP Public Auction Preparation
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
02-22-10-TCAAP-WS
>
1A, TCAAP Public Auction Preparation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:46:48 AM
Creation date
2/22/2010 9:42:07 AM
Metadata
Fields
Template:
General
Document
TCAAP Public Auction Preparation
General - Type
TCAAP Public Auction Preparation
Date
2/22/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subd. 1 — General Procedure. This section is a summary of the overall planning <br /> and review procedure for the PUD. <br /> Subd. 2 — PUD Concept Plan Review. In the existing zoning code, applicants <br /> have the option for a concept plan review that allows for a non-binding meeting to <br /> discuss the aspects of a proposal. Staff is proposing to make the concept plan <br /> review a requirement for the TCAAP planning process. <br /> Subd 3 — Public Engagement Plan. Due to the potential impact on the <br /> community, public input and participation is important for creating the master <br /> plan. This subdivision would require the applicant to implement a public <br /> engagement plan. <br /> Subd 4 — PUD Master Plan. This subdivision describes the process and <br /> information requirements for submitting an application to create the TCAAP <br /> master plan. Part C is particularly important because it defines when a PUD <br /> application would be deemed complete. Once an application is complete, the City <br /> is subject to the statutory 120 day review process. In order to consider the <br /> application complete, the applicant would need to complete the components in <br /> subdivisions five through 14. The City will also have the ability to institute a <br /> development moratorium for TCAAP if that becomes necessary. <br /> Subd 5 to 14 — These ten components list the information and performance <br /> requirements for a future master plan. Essentially, these components set the <br /> direction for the City and a developer. This is where the City can set a balance <br /> between some flexibility and particular requirements. <br /> Staff recommends reviewing each component since this is where additional detail <br /> or information may be needed. The ten planning components include: <br /> • Land Use <br /> • Design Standards <br /> • Transportation and Parking <br /> • Park, Recreation and Open Space <br /> • Utilities <br /> • Construction Staging <br /> • Environmental Review and Remediation <br /> • Sustainability <br /> • Contractual <br /> • Financial <br /> Subd. 15. PUD Final Plan. This is the final phase of the PUD process and is used <br /> when a developer actually starts construction on a particular phase. The PUD <br /> City of Arden Hills <br /> C.-Documents and Settings lbecky.brazys lLocal Settings)Temporary Internet Files IOLKl 5FI022210-CC Memo-TCAAP Planning and Public <br /> Engagement.doc <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.