My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3-17-10 EDC Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Economic Development Commission (EDC)
>
EDC Packets
>
2010
>
3-17-10 EDC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 11:34:39 AM
Creation date
3/12/2010 11:12:48 AM
Metadata
Fields
Template:
General
Document
3-17-10 Agenda & Packet
General - Type
EDC
Date
3/17/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br />(ii} The parks shall be integratec� into the developr�ent and connected <br />with trails and sidewa��s. <br />(iii) �'he City rnay accept t�e on-site stormwater ponding as part af the <br />dedication requirement if i� is ineorporated as a feature of the park or <br />open space. <br />(iv) The parks sha�l provide amenit�es suc�. as, but not limited to, <br />picn�c shelters, play structures, benches, �va�k��g pat�s, ba�l fie�ds, <br />tenr�is eourts, and baske�ball courts. <br />C. Dedlcation ta the Publzc. T�e re��rves the �i�l�t ta requ�re aIl or a <br />portion of the park, recreation, a�d open space :���tem to be dedicated <br />to the public. T�e �ity may �equir-e all or a por��o� of the systerr� to be <br />�rivately managed and n�a�ntained �� a business im�r€��vement district, <br />homeowr�ers associat�on, o�- �ther srn�.��ar organization a� approved by <br />the City. <br />D. Environmenta� Remediat��n. Prio� �o i�ie City accepting any dec�icated <br />Iand for park �.�d �pen space uses, �� applicant sha11 camp�ete the <br />enviro�rnental re�ec������� to �evels acc�p�ab�e for re�reational uses as <br />regulate� by the Nlinnesot� P�l��ttion C��tro� Agency (MPEA}. The <br />applicant s�a�I pro�v�de t�e C�� �v��h a Certi�cate af Completian, <br />�3��e1�►�ment Cornpl�t�on letter, �r similar document provided by the <br />` MP�1�> <br />Subd. 9 e LT����t��s �o���nent. <br />A, Ail �#����ies, ine�uding e�ectric uti�ities, shall be installed undergraund <br />�.���s walved by �ne c�ty. <br />B. E�e�trical su�stations sh�l� be su�stantially screened from adjacent <br />proper��e�. <br />Subd. ��. Constr�ctiQn Staging Campo�en�. A construct�on staging plan shall <br />conta�n a��.� �r maps setting �ort� the proposec� ehronological order of cons�ruction <br />reia�ing eac� p�-oposed use and structure to the construction of the various services <br />and facil�ti�s as ma� be requ�red �erein. Said stagir�g plan shal� tnclude est�mated <br />completion dates ar�d shall specify the praposed order of �-eques� �or uti�ity release ar <br />aut�orit� to occupy completed structures so as to provide a bas�s for deter�nining t�e <br />adequacy of the re�a�ed services and facil�ties for each separa�e construction phase. <br />Subd. 1�. Enviror�men�al Review and Remediation Component. <br />�RaF�r: 3�� a2a� o <br />Page 11 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.