My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1B, Public Works Maintenance Staffing & Workload
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
03-15-10-WS
>
1B, Public Works Maintenance Staffing & Workload
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:25:06 AM
Creation date
3/15/2010 2:12:13 PM
Metadata
Fields
Template:
General
Document
Public Works Maintenance Staffing
General - Type
Public Works Maintenance Staffing
Date
3/15/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2009 Full Time Maintenance Staff <br /> Hours by Activity <br /> (Through October 10, 2009) <br /> Snow & Ice Control 367.5 <br /> Paved Surface Maintenance & Repair 638 <br /> Vehicle & Equipment Repairs & <br /> Maintenance 1234.5 <br /> 1, <br /> General Turf Maintenance 741.5 <br /> Forestry 328 <br /> Garden Maintenance 359 <br /> Building/Structure/Facility/Maintenance <br /> & Repair a95.5 <br /> Athletic Fields & Court Maintenance 1188 <br /> Sign & Signal Maintenance i 20.5 <br /> Water System Maintenance & Repair 746 <br /> Water Service Maintenance (Meters, <br /> etc_) 448.5 <br /> Sewer System Maintenance & Repairs 608_5 <br /> ''Lift Station Repair & Maintenance 1 275 <br /> 1&1 Mitigation 159.5 <br /> Surface Water <br /> Management/Environmental 441.5 <br /> Locates & ROW <br /> Inspections/Maintenance 440.E <br /> Time Off 1749.E <br /> Training/Meetings 776.5 <br /> Special Project/Other 304.5 <br /> Supervision 905.5 <br /> Stand By/On Cali 308 <br />
The URL can be used to link to this page
Your browser does not support the video tag.