Laserfiche WebLink
DRAFT <br /> (ii) The parks shall be integrated into the development and connected <br /> with trails and sidewalks. <br /> (iii) The City may accept the on-site stormwater ponding as part of the <br /> dedication requirement if it is incorporated as a feature of the park or <br /> open space. <br /> (iv) The parks shall provide amenities such::.:as, but not limited to, <br /> picnic shelters, play structures, benches, ralking paths, ball fields, <br /> tennis courts, and basketball courts. <br /> C. Dedication to the Public. The reserves the right to require all or a <br /> portion of the park, recreation, and open space system to be dedicated <br /> to the public. The City may require all or a portion�f Ihe system to be <br /> privately managed and maintained by a business improvement district, <br /> homeowners association o#ier, o sin lar organization a :approved by <br /> the City. <br /> D. Environmental emediation. Prior t the City accepting any dedicated <br /> land for park and open space uses, we..applicant shall complete the <br /> environmental remediat c n to levels acceptalfle for recreational uses as <br /> regulated by the M nnesot �...-.1 on Control Agency (MPCA). The <br /> applicant shall provide the CIt v th a Certificate of Completion, <br /> Ieelpment....... <br /> Completion letter, or..- 'similar document provided by the <br /> MPCA <br /> Subd. 9. U li onent. <br /> All utlt�es includin electric utilities shall be installed underground <br /> g <br /> unless waived by the City. <br /> B. Electrical substations shall be substantially screened from adjacent <br /> ... <br /> properties. <br /> Subdl 1 Q ,,,:.Cons tr tion Staging Component. A construction staging plan shall <br /> contain a reap or maps setting forth the proposed chronological order of construction <br /> relating each proposed use and structure to the construction of the various services <br /> and facillt es as may be required herein. Said staging plan shall include estimated <br /> completion dates and shall specify the proposed order of request for utility release or <br /> authority to occupy completed structures so as to provide a basis for determining the <br /> adequacy of the related services and facilities for each separate construction phase. <br /> Subd. 11. Environmental Review and Remediation Component. <br /> DRAFT:3/10/2010 <br /> Page 11 of 14 <br />