Laserfiche WebLink
Bud et <br />The 2010 capital improvement plan (CIP) includes $10,000 for the construction of one or more <br />gateway signs, which is funded by the EDA General Fund. The EDA General Fund is primarily <br />funded through a transfer from the General Fund. <br />Attachment <br />A. EDC Gateway Sign Design Concept <br />B. Arden Plaza Gateway Sign Design Concept <br />C. SignArt USA Gateway Sign Design, Location Map, and Location Pictures <br />City of Arden Hills <br />IlAhdocsllahlAHdatalPlanninglEconomic DevelopmentlGateway Signs1041210 - CCMemo - Gateway Sign Selection.doc <br />Page 3 of 3 <br />