Laserfiche WebLink
• Non-exempt hourly <br />• Salary Range: $30.94-36.53 <br />• Employment term = 18 months. <br />• Supervised by City Engineer. <br />• Estimated 1800 hours. <br />• Multiplier: Since this is a part time employee and some of the benefits are not the same, <br />we would propose that the employee hourly cost would be 1.6 times the hourly rate. <br />This employee would need a computer, Microsoft software licenses, office space, and a desk <br />phone at Arden Hills City Hall. Optional equipment would include a cell phone. Consistent <br />with our existing JPA, these would be provided by Arden Hills. <br />Without hiring additional assistance, the highlighted proj ects in the work plan table from the <br />March 1 Sth packet (attached) would not be accomplished in 2010. The green highlighted proj ects <br />would be pushed off to 2011. The yellow highlighted proj ects could not be accomplished in <br />2010 by existing Roseville staff; the timing of these projects is outside of the City's control. <br />Recommendation <br />At this time Roseville staff is recommending that we move ahead with our search for a part time <br />Civil Engineer to assist with the completion of the 2010 work plan. We are currently going <br />through a hiring process for an Engineering Proj ect Coordinator; some of the applicants for that <br />position are qualified for the Civil Engineer position. Once the Arden Hills City Council <br />provides the City of Roseville with a letter authorizing us to move ahead with this endeavor, we <br />would propose to start with this pool of applicants to determine level of interest. <br />Council Action Requested <br />Authorize the City Administrator to write a letter to the City of Roseville requesting to hire a part <br />time Civil Engineer to assist with the completion of the 2010 engineering work plan. <br />City Council Meeting <br />C:�Documents and Settings\becky.brazys\Local Settings\Temporary Internet <br />Files\Content. Outlook\2R69UP45\ 10_0426_Memo_201 OWorkplan. doc <br />Page 3 of 3 <br />