Laserfiche WebLink
more strongly encourage car pooling. It is an�icipated that Land O'Lakes employees will be <br />up�ated by rr�anagen�.ent on a regular basis in regarcls to stall closur�s and construction <br />schedule. <br />• Project construction tirne wil� be greatly reduced by permitting construction activity to occur <br />during evening h�urs. �Iaving the parking lots and drive isles vacated of vehicles during the <br />evening hours great�y �mproves the efficiency of construction and safety of �and O'Lakes <br />ernployees. The contractor will be aliowed to work wi�hou� major concerns of Land O' Lakes <br />employees entering the construct�on zone and consiruction vehicles will be perr�itted to drive <br />aroun� the site without major conflict �f Land O'Lakes er�ployee ve�icles. <br />Proposed Construction Start and End Dates <br />�'�e (�wner and BKBM �as me� vvith seve�al contractors io determine the approximate length of <br />construction necessary considerir�g evening constructior� wil� be permitted by the City. The <br />following is an ant�cipated schedule based upon receiving City Counci� approval on IVIay 10, 2010 <br />�or afier hour construc�ion activities. <br />� Receive City Counci� Approval on May 10, 2010 <br />• Contractor �i�ding 1VIay 25 tl�rough June 10, 2010 <br />• Award contract �� or about �une 17, 2010 <br />� Start �onstr�ction on o� about July 9, 2010 <br />� Construction Completed on ar befor� August 3 0, 2010 <br />S incerely, <br />BKBM ENG�NEERS <br />� �'� <br />Thomas J. Cesare, P.E. <br />Principal <br />Co�y:l File <br />Kevin Taaffe — Land O' Lakes <br />�Zoger Oberg — �KB1V1 �ngir�eers <br />Direct Line: (7b3) 843-0464 <br />Cell Line: (612) 812-42�� <br />Page 3 <br />