My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2A, TCAAP Zoning Project
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
05-24-10-TCAAP-WS
>
2A, TCAAP Zoning Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 12:19:29 AM
Creation date
5/21/2010 8:48:53 AM
Metadata
Fields
Template:
General
Document
TCAAP Zoning Project
General - Type
TCAAP Zoning Project
Date
5/24/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> b. Efficiency of all building mechanical systems that burn, convert, <br /> or transform the energy in natural gas, electricity, oil, coal, steam, or <br /> purchased heat or cold in any form. <br /> c. Calculations shall not include manufacturing or mechanical <br /> processes for which the State of Minnesota has not set a minimum <br /> standard. <br /> B. Stormwater management. Low-impact development techniques shall <br /> 1: <br /> be employed within each phase of the PUD master;Plan, to include, but <br /> not limited to: <br /> 1. Use of rain gardens and other m6fl" for bioretention of <br /> stormwater runoff. <br /> 2. Use of bioswales a imilar features designed aoap:pollutants <br /> and silt in runoff. <br /> 3. Integration of green roofs'� goof gardens on buildings. <br /> 4. Use of pd .pavement for p&ng areas, walkways, plazas <br /> and other paved srfo <br /> 5. Development of infernal om ards with plants and water <br /> Dein of stormwae collection areas as park features and public <br /> �:enitls. <br /> C Out doo .lighting. AlI street lighting and lighting of walkways and <br /> Mc areal a.............. <br /> .......... <br /> ll be Dark Sky-compliant and energy efficient (LED or <br /> egent) <br /> SOd. 12. Contracal Component. The City shall prepare the necessary <br /> deve ent agreent or contracts for the PUD Master Plan. The applicant shall <br /> submit emenW or contracts affecting the owner or owners of individual units or of <br /> the enter+ pct proposed under the PUD Master Plan, such as homeowners' <br /> agreements,...,,business improvement areas, and covenants. <br /> Subd. 13. Financial and Resource Component <br /> A. The applicant must demonstrate that the tax base of the redevelopment <br /> will support the long-term maintenance of the on-site infrastructure and <br /> support City services including,but not limited to, police, fire, inspections, <br /> and maintenance of roads and parks. The City shall require a detailed pro <br /> forma that shall be updated with each PUD Final Plan to ensure that the <br /> DRAFT:5/20/2010 <br /> Page 19 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.