My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2A, TCAAP Zoning Project
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
05-24-10-TCAAP-WS
>
2A, TCAAP Zoning Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 12:19:29 AM
Creation date
5/21/2010 8:48:53 AM
Metadata
Fields
Template:
General
Document
TCAAP Zoning Project
General - Type
TCAAP Zoning Project
Date
5/24/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> development is supporting the services and infrastructure required for the <br /> development. <br /> B. The applicant shall be responsible for all costs related to studies, <br /> consultants, and City staff time needed to facilitate the review of the <br /> application. The City reserves the right to select or reject any consultant. <br /> C. All development and permitting fees in the City's fee schedule apply, <br /> including the Metropolitan Council's and AL n Hills' sewer access <br /> charge and water access charge. <br /> Subd. 14. Construction Staging Component. A �fMWtion staging plan shall <br /> g g <br /> contain a map or maps setting forth the proposedronolo order of construction <br /> relating each proposed use and structure to : . constructio `the various services <br /> and facilities as may be required herein, .I..ncnudin but not limited.to transportation <br /> improvements and park and open spAo ..improvements. Said staging".plan shall <br /> include estimated completion dates and shill specify the proposed order `request for <br /> T.. <br /> utility release or authority to occupy compl &Wbs so as to provide a basis for <br /> determining the adequacy of the related serves and facilities for each separate <br /> construction stage. <br /> Subd. 15. Subdivision Component. <br /> A. Each subdivision shall contain a d s ptive statement of the principles <br /> goyorm 4 the proposed subdivision f land, including lot design for <br /> Various proposed land use . Each subdivision request shall include all of <br /> the documentation necessary for preliminary plat approval as found in the <br /> Sub isionilkdinance of the City of Arden Hills. This component shall <br /> be in`s� �+ ent da that it can serve as the basis for determining the <br /> .......... onfornty cif any PU...........D final Plan to the PUD Master Plan. <br /> B C subdii shall be approved until the PUD Master Plan is <br /> approm. <br /> C. No, division that isolates an area due to environmental remediation <br /> ;.needs:€► requirements shall be approved. <br /> Each subdivision shall comply with the Response Action Plan (RAP) <br /> `--and remediation requirements in Section 1320.135 Subd. 10, <br /> Environmental Review and Remediation Component. Each subdivision <br /> shall require a financial surety to ensure that the environmental <br /> remediation is completed in conformance with the approved (RAP) or <br /> other environmental remediation requirements as determined by the City <br /> and the Minnesota Pollution Control Agency(MPCA). <br /> Subd. 16. Planned Unit Development (PUD) Final Plan. <br /> DRAFT:5/20/2010 <br /> Page 20 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.