Laserfiche WebLink
DRAFT <br /> A. Purpose. The purpose of the PUD Final Plan is to implement and <br /> ensure conformity with the PUD Master Plan. Each stage of the PUD <br /> Master Plan shall require a PUD Final Plan before development. <br /> B. Procedures. The applicant for a PUD Final Plan approval of a specific <br /> stage of the PUD Master Plan shall complete and submit to the zoning <br /> administrator an application on such forms as are provided by the <br /> administrator, including all application fees and escrows. Other <br /> applications such as preliminary plat, final platy:�nditional use permit <br /> may also be required. The applicant shall P de the following: <br /> 1. A written statement describing"the prop0§ed development in the <br /> PUD Final Plan applicationxw <br /> 2. The proposed startin j#nd completion dates four the construction <br /> and any required envirdfiNffilal rem6dWion. <br /> 3. The applicant shall submit dumentation demonstrating that the <br /> PUD Final P1a s in conformance uth the PUD Master Plan and each <br /> of the compond. KkApction 1325.1 5 subdivisions 5 through 15. <br /> C. Land Use Applick on Co p , te. Thy TUD Final Plan application <br /> shall be considered oTrete *` o e >, 11 required application and <br /> docdai&atlon requireVSubdivisjos. 5 through 15 are submitted and <br /> dined coete by the City <br /> w f . <br /> ': <br /> ; <br /> D. Dvelonnt Agreement and Bonding. <br /> 4 <br /> 1. T assure that11 improvements to be constructed as part of the <br /> qp <br /> rovedJD Final Plan and any required environmental remediation <br /> q <br /> compl4Z : ti accordance with the terms and conditions of such <br /> p or egh stage thereof as outlined in the construction order <br /> cofWnent the City Council, at the time of its approval of said PUD <br /> Firs rPlan and any related plats shall require the applicant to enter into <br /> and le with the administrator a development agreement with the City <br /> aid a corporate surety bond guaranteeing the faithful performance of <br /> .v the applicant's obligations under said development agreement, and in <br /> completion of all improvements provided for in the PUD Final Plan in <br /> a penal sum equal to one hundred twenty-five (125)percent of the cost <br /> of such improvements as estimated by the City, which agreement and <br /> bond shall be filed with the administrator no later than sixty (60) days <br /> after such requirement has been made by the City Council. <br /> 2. The development agreement may provide for several bonds <br /> covering separate aspects of the PUD, the aggregate of which shall <br /> DRAFT:5/20/2010 <br /> Page 21 of 22 <br />