My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4E, Resolution 2009-027 Accepting 2009 PMP 2-Year Warranty
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
05-24-10-R
>
4E, Resolution 2009-027 Accepting 2009 PMP 2-Year Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 10:04:38 AM
Creation date
5/21/2010 8:53:05 AM
Metadata
Fields
Template:
General
Document
2009 PMP 2-Year Warranty
General - Type
Resolution 2009-027
Date
5/24/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction stakes that were disturbed by the contractor on the proj ect during <br />construction. The final total engineering costs were $3,223.40, or 1.5%, over the <br />estimated engineering costs. This includes permit fees and addressing unanticipated <br />resident and contractor concerns, including driveway requests, turf and landscape <br />restoration issues, as well as time spent preparing for unanticipated resident and City <br />Council meetings to discuss the type of curb to be constructed. <br />The following table shows final costs allocated to each of the funds, including <br />construction costs, Bolton & Menk and Roseville engineering costs and overhead fees. <br />Frattalone Bolton & 17% <br />Budgeted Companies, Inc. Menk Roseville overhead TOTAL <br />Roadway $1,625,000 $ 868,620.39 $117,835.86 $55,423.29 $147,665.47 $ 1,189,545.01 <br />Storm Sewer $ 370,000 $ 201,755.81 $ 27,369.92 $12,873.25 $ 241,998.98 <br />Sanitary Sewer $ 45,000 $ 52,822.02 $ 7,165.76 $ 3,370.37 $ 63,358.15 <br />Watermain $ 25,000 $ 7,370.51 $ 999.87 $ 470.28 $ 8,840.67 <br />Total $2,065,000 $1,130,568.73 $153,371.42 $72,137.19 $ 1,503,742.81 <br />Council Action Requested <br />Motion to approve Resolution 2010-027: accepting the work completed as the 2009 <br />Pavement Management Program, starting the two-year warranty and authorizing Payment <br />#9 (final payment) to Frattalone Companies, Inc. in the amount of $127,873.22. <br />City Council Meeting <br />\�Metro-inet.us\ardenhills�PR&PW\Engineering\Council_Actions\2010\5-24- <br />l OMemo_2009PMP_Payment9_Final. doc <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.