Laserfiche WebLink
DRAFT <br />5. The parks shall provide amenities such as, but not limited to, <br />picnic shelters, play structures, benches, walking/bike paths, ball <br />fields, tennis courts, and basketball courts as approved by the City. <br /> <br />6. The plan shall dedicate land to complete a one hundred and fifty <br />(150) foot wide Ramsey County South Regional Trail corridor along <br />the eastern property line in any location where the trail corridor width <br />is less than one hundred and fifty (150) feet. <br /> <br />C. Dedication to the Public. The City reserves the right to require all or a <br />portion of the park, recreation, pathway, and open space system to be <br />dedicated to the public. The City may require all or a portion of the <br />system to be privately managed and maintained by a business <br />improvement district, homeowners association, or other similar <br />organization as approved by the City, provided that the system remains <br />open to the general public. <br /> <br />D. Environmental Remediation. Prior to the City accepting any dedicated <br />land for park and open space uses, the applicant shall complete the <br />environmental remediation to levels acceptable for recreational uses as <br />regulated by the Minnesota Pollution Control Agency (MPCA). The <br />applicant shall provide the City with a Certificate of Completion, <br />Development Completion letter, or similar document provided by the <br />MPCA if remediation is necessary. <br /> <br />Subd. 8. Utilities Component. <br /> <br />A. All utilities, including electric and cable utilities, shall be installed <br />underground. <br /> <br />B. Electrical substations shall be substantially screened from adjacent <br />properties. <br /> <br />Subd. 9. Alternative Urban Areawide Review Component. The applicant shall <br />complete an Alternative Urban Areawide Review (AUAR) prior to approval of the <br />PUD Master Plan. The AUAR shall be completed in accordance with requirements <br />set by the Minnesota Environmental Quality Board and other applicable agencies. <br />Recommendations provided by the final AUAR shall be incorporated into the PUD <br />Master Plan unless otherwise waived by the City. <br /> <br />Subd. 10. Environmental Review and Remediation Component. <br /> <br />A. A Response Action Plan shall be prepared that can accommodate the <br />proposed land uses. The plan shall meet all Minnesota Pollution Control <br />Agency (MPCA), United States Environmental Protection Agency (EPA), <br />and any other applicable agency’s requirements. The plan shall include a <br />DRAFT: 6/3/2010 <br />Page 44 of 50