My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2B, Arden Hills Library Update
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2010-2019
>
2010
>
07-26-10-WS
>
2B, Arden Hills Library Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2024 12:13:14 AM
Creation date
7/26/2010 8:11:19 AM
Metadata
Fields
Template:
General
Document
Arden Hills Library Update
General - Type
Arden Hills Library Update
Date
7/26/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
---,-A- VEN HILLS <br /> MEMORANDUM <br /> DATE: July 26, 2010 Item 2.B <br /> TO: Mayor and City Council <br /> Patrick Klaers, City Administrator <br /> FROM: Meagan Beekman, City Planner <br /> SUBJECT: Arden Hills Library Update <br /> Ramsey County Library Board Meeting <br /> On July 21 the Ramsey County Library Board met for their regular meeting. On the agenda was <br /> a discussion about the concept of moving the Arden Hills Library from its existing location to the <br /> New Brighton Community Center. The Library Board hired a consultant to prepare a feasibility <br /> report (Attachment A). The report provided a space program and fit plan, a site plan with <br /> parking arrangements, and a cost estimate of the build out. The report also analyzed the cost <br /> comparison between the estimated build out of the New Brighton site, and an estimate of the <br /> costs to renovate the existing building up to a level of service comparable with the New Brighton <br /> option. <br /> Highlights from the feasibility report were as follows: <br /> • Estimated cost of build out of the New Brighton option: $1.2 million <br /> • Estimated cost of renovation of existing space (to provide a comparable level of <br /> service to a new facility): $1.8 million <br /> • A building addition to the existing community center would be required to meet the <br /> library's space needs <br /> • A parking lot addition of 47 stalls would likely be necessary <br /> • HVAC and utility capacity at the community center can be modified to accommodate <br /> the library use <br /> The Board Members asked for current and proposed operating expenses of the two facilities. <br /> Ms. Nemitz apologized for not having this information and said she would provide it at the next <br /> Board meeting on August 18, along with an estimate of the operating costs for the Presbyterian <br /> Homes option as well. <br /> City of Arden Hills <br /> City Council Meeting for July 26, 2010 <br /> IlMetro-inetlardenhillslAdminlCouncilWgendas&Packet Information 120N 7-26-10 WorksessionW-26-10-Arden Hills Library Update.doc <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.