My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-12-10-R
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2010-2019
>
2010
>
07-12-10-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2010 3:19:45 PM
Creation date
8/18/2010 3:18:36 PM
Metadata
Fields
Template:
General
Document
Regular Council Minutes
General - Type
Regular Council Minutes
Date
7/12/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL -July 12, 2010 5 <br />7.A. Resolution 2010-038 Awarding Bid for the CP Rail Trail Crossing Project ~ Addendum <br />No. 2 with Bolton &Menk, Inc. for Construction Services in an Amount of X40, 032 <br />(continued) <br />Councilmember Holden asked if the City had worked with either Blackstone Contractors or <br />Lametti & Sons in the past. <br />Civil Engineer Giga stated Roseville has worked with Lametti & Sons in the past and Arden <br />Hills would be working with Lametti & Sons on the sewer-lining project this year. Neither City <br />has worked with Blackstone before, however, Staff did check references which were all positive. <br />Mayor Harpstead asked Civil Engineer Giga if this type of situation had ever occurred in the <br />past and what the results had been. <br />Civil Engineer Giga stated almost always in a project there are miscalculations in at least one of <br />the bids presented. This is why all bids are recalculated before a proj ect is awarded. This does <br />not always result in a change of who is the low bidder. Last year Roseville did have a situation <br />where the apparent low bidder at the meeting was not the low bidder when the bids were verified. <br />Roseville awarded the bid to the new low bidder. <br />MOTION: Councilmember McClung moved and Mayor Harpstead seconded a motion_to <br />Adopt Resolution 2010-038: Awarding the CP Rail Bride Trail Crossing <br />Pr~ to Blackstone Contractors, of Corcoran=Minnesota, in the Amount of <br />$312,587.27 and to Approve Addendum No. 2 with Bolton &Menk, Inc. for <br />Construction Engineering Services in,an Amount of $40,032. <br />Mr. Mark Jay, 4411 Morningside Avenue, Vadnais Heights, representing Lametti ~ Sons, stated <br />the bid opening was in process in Council Chambers. The clock in the Council Chambers is three <br />(3) minutes faster than the clock at the receptionist desk so anyone bringing in a bid according to <br />the receptionist clock would have been late according to the Chamber clock. Lametti & Sons is <br />requesting the bid from Blackstone Contractors be considered nonresponsive since the bid <br />opening was underway when it was brought into the Chambers. According to the specifications <br />set by Bolton &Menk bids could not be received after the opening of the bids had started <br />Councilmember Holden asked who Lametti & Sons had brought their bid to when it was brought <br />in. <br />Mr. Jay stated he had not personally brought it in but assumes it went to the clerk. <br />Councilmember Holden clarified the clerk who received the bid from Lametti & Sons was the <br />same clerk who received the bid from Blackstone and the same clock was used when these bids <br />were receive . <br />Councilmember Holmes asked if the Blackstone had changed their bid in order to under bid <br />Lametti & Sons. <br />Parks and Recreation Manager Olson stated the companies did not change the bids received by <br />the City. The changes that occurred were the result of calculating errors on the bids that were <br />
The URL can be used to link to this page
Your browser does not support the video tag.