Laserfiche WebLink
�.�.��� <br />r�•� <br />Request for Quote: Old Snelling Avenue Improvements <br />The City of Arden Hills is seeking quotes for engineering services to assist the City in preparing a <br />preliminary proj ect report for the improvements to Old Snelling Avenue, from County Road E to TH S 1. <br />Please refer to the attached location map. In order to prepare the proj ect report, the City would like the <br />consultant(s) to conduct a topographic survey, create a base map, prepare a design recommendation and <br />cost estimate for a culvert/bridge structure, and provide general engineering services on an as-needed <br />basis to assist the City with the report preparation. Construction for this improvement project could start <br />as early as 2012. <br />This RFQ is divided into the following separate Schedules for professional services: <br />I. Schedule 1— Topographic Survey & Base Mapping Services <br />II. Schedule 2— Engineering Services <br />You may submit an RFQ to the City for one or both of the Schedules listed above. The City will consider <br />awarding the described work in Schedule 1 and Schedule 2 separately, to the most qualified consultant or <br />consultants. <br />GENERAL PROJECT SCOPE <br />The Arden Hills City Council has identified the referenced segment of Old Snelling Avenue as a State <br />Aid roadway that is in need of improvement. The City Council has authorized Staff to investigate various <br />reconstruction/resurfacing alternatives for the roadway and provide a report to the City Council that <br />describes the alternatives, associated costs, and financing. This segment of Old Snelling Avenue is <br />approximately 4,300 feet long and lies within a 200-foot right-of-way. The projected 2011 Pavement <br />Condition Index (PCI) for the roadway is 7. <br />REQUIRED SERVICES DESCRIPTION <br />I. Schedule 1— Topo,�aphic Survev d� Base Mappin� Services: <br />The City will hire a separate consultant for the soil analysis for the proj ect area. The final report will <br />be distributed, once it is completed. The Consultant should complete a topographic survey for the <br />Qld Snelling Avenue segment listed above. <br />1. C4NTROL POINTS <br />Set up control points on the proj ect. Control points should be placed beyond expected <br />construction limits so that they can be utilized during construction. Enough control <br />points should be placed on the proj ect so that if certain control points are vandalized or <br />otherwise lost, the control can easily be re-established. Control points should be set up <br />using Ramsey County coordinates. City and County benchmarks should be utilized for <br />vertical control. A copy of the benchmark information is available in the Public Works <br />Department. <br />2. UTILITY L�CATI4N <br />Call Gopher State to assemble utility information which shall be incorporated on the base <br />mapping. The selected consultant shall also incorporate City utility as-built drawings into <br />the base mapping. As-built drawings will be provided to the consultant. <br />3. CROSS-SECTION DATA <br />Provide cross-section point data at 50 foot stations, all driveway locations and where the <br />topography changes between 50 foot stations. At a minimum the cross section data <br />