Laserfiche WebLink
2, The City Council approved the rezoning of the Property "Resolution No. <br />2010- 064 approved the Preliminary and Final Plat of the Property <br />"Resolution No. 2010- 065 approved the Amendment of the <br />Conditional Use Permit for the Property "Resolution No. 2010- 066 and <br />approved the Master Planned Unit Development and Final Planned Unit <br />Development Plans for the Property "Resolution No. 2010 -067). The <br />action of the City Council was based on the findings and subject to the <br />recommendations contained in the report of the City Planner dated <br />November 29, 2010; and upon the terms and conditions contained herein. <br />3.0 Terms and Conditions. In consideration of the above referenced City Council approvals, <br />in compliance with the provisions of the City's Development Regulations, and in <br />consideration of the undertakings herein expressed, the parties agree: <br />A. Development Plans. Developer shall construct the project in compliance with the <br />following plans, requirements and specifications "Project Plans signed and <br />dated by the City Planner (Exhibits E -1 through E -16, attached and incorporated) <br />and contained in the City's file for Planning Case No. 10 -012. Any significant <br />changes to these plans, as determined by the City Planner, shall require review <br />and approval by the Planning Commission and City Council: <br />1. Lake Johanna Fire Department Memo dated September 13, 2010, or other <br />solutions as agreed to by the Fire Marshal (E -1). <br />2. Public Work Director's Memo dated November 24, 2010 (E -2). <br />3. Narrative for Project Application Submittal dated October 28, 2010, and <br />additional Narrative dated November 23, 2010 (E-3). <br />4. Illustration of Building Elevations revised October 25, 2010, prepared by <br />Pope Architects -3 Sheets (E -4). <br />5. Preliminary Plat prepared by Sunde Land Surveying dated August 31, <br />2010 and updated October 15, 2010 -6 sheets (E -5). <br />6. Overall Site Plan prepared by Clark Engineering Corp. dated October 25, <br />2010-sheet C 1.0 (E -6). <br />7. Site Development Plan prepared by Clark Engineering Corp. dated <br />October 25, 2010 Sheets C 2.0 and C 2.1 (E -7). <br />8. Geometric Site and Phasing Plan prepared by Clark Engineering Corp. <br />dated October 25, 2010-Sheets C 3.0 and C 3.1 (E -8). <br />9. Zoning District Plan prepared by Clark Engineering Corp. clarified <br />November 24, 2010-Sheet A 1.1 (E -9). <br />4 <br />