My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-08-10-PC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2010-2019
>
PC Packets 2010
>
12-08-10-PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 2:49:41 PM
Creation date
12/2/2010 2:35:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hilts_ Chapter 13 Zoning Code <br />Code. Energy efficiency is to be defined by the use of purchased <br />(generated or refined at a separate site) or on -site- generated fuels <br />consumed per square foot of occupied space. Calculations can take into <br />account the use of the following: <br />a. On -site generated renewable energy, including photovoltaic, wind, <br />or hydro generation of electricity; passive solar systems using solar heat <br />or light; geothermal source; or other use of renewable fuels displacing <br />the use of non renewable fuels in the building's systems. <br />b. Efficiency of all building mechanical systems that bum, convert, or <br />transform the energy in natural gas, electricity, oil, coal, steam, or <br />purchased heat or cold in any form. <br />c. Calculations shall not include manufacturing or mechanical <br />processes for which the State of Minnesota has not set a minimum <br />standard. <br />B. Stormwater management. wAtil development techniques shall be <br />employed within each phasei..bf the PUD Master Plan, to include, but not <br />limited to: <br />1 Use of rain gardens an :other methods for bioretention of stormwater <br />runoff. <br />2. Use of b osv ales and similar features designed to trap pollutants and <br />silt in runo <br />3. Integffition Integration Migreen roofs and roof gardens on buildings where feasible <br />to coiffrol raiiiiiyater and other benefits. <br />4. Use 0:F rvious pavement for parking areas, walkways, plazas and <br />other paved surfaces. <br />5. Development of internal courtyards with plants and water features. <br />6. Design of stormwater collection areas as park features and public <br />amenities. <br />C. Outdoor Lighting. All street lighting and lighting of walkways and public <br />areas shall be Dark Sky compliant and energy efficient (LED or equivaIent). <br />Subd. 12. Contractual Component. The City shall prepare the necessary development <br />agreement or contracts for the PUD Master Plan. The applicant shall submit agreements <br />or contracts affecting the owner or owners of individual units or of the entire project <br />proposed under the PUD Master Plan, such as homeowners' agreements, business <br />improvement areas, and covenants. <br />Section 1 320 District Provisions <br />Adopted: November 13, 2006 <br />Page 52 of 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.