My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res. #10-028a - Accept Bids & Awarding Contract for Downtown Storm Water Reclamation Project - Phase I
Centerville
>
City Council
>
Resolutions
>
2000-2023
>
2010
>
Res. #10-028a - Accept Bids & Awarding Contract for Downtown Storm Water Reclamation Project - Phase I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2011 10:11:07 AM
Creation date
11/19/2010 12:05:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t � 2335 Highway 36 W <br /> St. Paul, MN 55113 <br /> Tel 651-636-4600 <br /> Fax 651-636-1311 <br /> www.bonestroo.com <br /> � Bonestroo <br /> October 27, 2010 <br /> Honorable Mayor and City Council <br /> City of Centerville <br /> 1880 Main Street <br /> Centerville, MN 55038-4794 <br /> Re: Downtown Storm Water Reclamation Project — Phase I <br /> Contract A— Storm Water Supply Line <br /> Project No. 000616-08167-1 <br /> Bid Results <br /> Dear Honorabfe Mayor and City Council: <br /> Bids were opened for the Project stated above on Tuesday, October 26, 2010. The Base Bid for this <br /> contract consists of installing the pipe between the pond and the wet well. The Alternate is to install an <br /> additional culvert under the trail to help prevent springtime flooding, which has been a recurring problem. � <br /> Transmitted herewith is a copy of the Bid Tabulation for your information and file. Copies will also be I <br /> distributed to each Bidder once the Project has been awarded. I <br /> There were a total of six Bids. The foliowing summarizes the results of the Bids received: I I <br /> Tota/ A/ternate Tota/ Base Bid P/us I <br /> ae-�`� �ase Bid No.1 A/ternate No. 1 � <br /> ow/#2 Ellingson Drainage, Inc. $124,721.6 $13,742.00 $138,463.65 � <br /> Lo ontracting, nc. , . 0 $12,280.12 $137,825.32 ' <br /> #3 Peterson Companies $128,401.47 $12,107,50 $140,508.97 ' <br /> #4 Veit & Company, Inc. $132,580.00 $11,838.00 $144,418.00 <br /> #5 Penn Contracting, Inc. $138,572.00 $10,028.00 $148,600.00 <br /> #6 Burschville Construction, Inc. $134,389.00 $15,933.00 $150,322.00 <br /> Based on the Base Bid only, the low Bidder on the Project was Ellingson Drainage, Inc. with a Tota! Base <br /> Bid Amount of $124,721.65. Based on the Base Bid plus Alternate No. 1, the low Bidder on the Project <br /> was GM Contracting, Inc. with a Total Base Bid plus Alternate No. 1 Amount of $137,825,32. <br /> This compares to the Engineer's Estimate of $120,000 ($135,000 with Alternate No. 1). These Bids have <br /> been reviewed and found to be in order. <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.