My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-12-22 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2010
>
2010-12-22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2010 12:11:48 PM
Creation date
12/17/2010 12:11:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*Electrical work commenced without filing the required pennit, in addition to the permit fee, shall pay�twoe ------- �rmatted: )ustified <br /> times the permit fee,�not to_exceed $1,000. *For purposes of interpretation,_Minnesota Rules,_Chapter_ `�'��- Deleted: $90or <br /> 3800, and the most recently adopted edition of the National Electric Code shall be prima facie evidence of ��' <br /> the definitions, interpretations, and scope of words and terms used. �� Deleted: (which ever is greacer) <br /> I Requests for Electrical Inspection (REI) with a fee of $250 or less expires 12 months from the filing date. <br /> The contractor must have the work completed within the 12-month period or submit another REI that <br /> includes the inspection fee for the uncompleted work. Inspection fees do not carry over from one REI to <br /> another. <br /> I Subject to State of MN surcharge fees. <br /> 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.