- - -
<br /> EXHIBIT E
<br /> LANDFILL, GRADING AND EXCAVATING PERMIT FEES
<br /> GRADING FEES
<br /> General. Fees shall be assessed in accordance with the provisions of this section or shall be as set
<br /> forth in the fee schedule ado ted b the 'urisdiction,
<br /> P Y J
<br /> Plan Review Fees. When a plan or other data are required to be submitted, a plan review fee shall
<br /> be paid at the time of submitting plans and specifications for review. Said plan review fee shall be set forth
<br /> in Table A33-A. Separate plan review fees shail apply to retaining walls or major drainage structures as
<br /> required elsewhere in this code. For excavation and fill on the same site, the fee shall be based on the
<br /> volume of excavation or fill, whichever is greater.
<br /> Grading Permit Fees. A fee for each grading permit shall be paid to the City as set forth in Table A33-
<br /> B. Separate permits and fees shall apply to retaining walls or major drainage structures as required
<br /> elsewhere in this code. There shall be no separate charge for standard tenace drains and similar facilities.
<br /> TABLE A33-A GRADING PLAN REVIEW FEES
<br /> 50 cubic yards (38.2 m3) or less ........................................................................................... No Fee
<br /> 51 to 100 cubic yards (40 m3 to 76.5 m3) ............................................................................ $37.01
<br /> 101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) .................................................................. $58.28
<br /> 1,001 to ]0,000 cubic yards (765.3 m3 to 7645.5 m3) ......................................................... $77.57
<br /> 10,001 to 100,000 cubic yards (7646.3 to 7645.5 m3) -$77.57 for the fiist
<br /> 10,000 cubic yards (7645.5 m3), plus $38.59 for each additional
<br /> 10,000 cubic yards (7645.5 m3) or fraction thereof.
<br /> 100,001 to 200,000 cubic yards (7645.6 m3 to 15,291.1 m3) -$424.86 for the
<br /> first 100,000 cubic yards (7645.5 m3), plus $20.87 for each addidonal
<br /> 10,000 cubic yards (7645.5 m3) or fracUOn thereof. I
<br /> 200,001 cubic yards (15,291.2 m3) or more -$633.55 for the first $200,000 cubic
<br /> yards (15,291.1 m3), plus $11.42 for each additional 10,000 cubic years
<br /> (7645.5 m3) or fraction thereof.
<br /> Other Fees:
<br /> Additional plan review required by changes, additions or revisions to appmved plans
<br /> (minimum charge - one-half hour) ...................................................................................... $79.54 per hour'�
<br /> *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, '
<br /> overhead, equipment, hourly wages and fringe benefits of the employees involved.
<br /> GRADING PERMIT FEES
<br /> , Deleted: 50 cubic yards (38.2 m3) or
<br /> to 100 cubic ards 40 m3 to 76 5 m3 0.00 �" less .$37.01¶
<br /> I �-----------�-�'--- �-------------'--- -).........,.........___..............................._...._..._...............�_--- ---- -:" s�
<br /> 101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) - 0.00 for the first 100 cubic yards ___ �
<br /> - - - - - - - ---- - ------ `�� DeleRed: 58.2s
<br /> (7b.5 m3). plus $27.56 for each additionai 100 cuh�c yards (76.5 m3) or fraction �`- __
<br /> thereoE � Deleted:58.28
<br /> � 1,001 to 10,000 cubic yards (765.3 m3 to 7,645.5 m3 -$3 4 for the first 1,000
<br /> ) ��-------------------------------------------- - Deleted:6
<br /> cubic yards (764.6 m3), plus $22.84 for each addirional 1,000 cubic yards �
<br /> (764.6 m3) or fracrion thereof. ��° 3
<br /> � 10,001 to 100,000 cubic yards (7,6463 m3 to 7,645.5 m3) -$51F�0_for the first_10,000_ _________________________ Dele6ed: 1
<br /> cubic yards (7,645.5 m3), plus $103.95 for each additional 10,000 cubic yards `�-- p gg
<br /> 27
<br />
|